Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 89
SN 22
A 4
K 0 Quiet
X-Ray B2.6
Wind 342.1 km/s
Aurora 1
Updated 00:30 UTC HamQSL · N0NBH
Day 80/40m Good 30/20m Fair 17/15m Poor 12/10m Poor
Night 80/40m Good 30/20m Fair 17/15m Poor 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Back to Product Links

OptiFuse FMR-1A, Circuit Protection Fuse UL Thru Hole Fast 250V 1A Round Body Radial Long Lead

Affiliate links. Check current pricing and availability with the seller.


Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.