Running a communications-failure tabletop: what should we inject, and what should we actually measure?
- Replies 2
- Views 46
- Created
- Last Reply
Top Posters In This Topic
-
Maria Garcia 1 post
-
Ashley Wilson81 1 post
I'd like to compare notes on designing disaster communication exercises, especially tabletop and simulated-traffic drills that go beyond "everyone checks in on the net." Check-in drills are useful for confirming that people can key up and be heard, but they rarely show where a communication plan breaks under pressure.
Here is a scenario skeleton that could work for a community group, a volunteer radio team, or a local response partner. Adjust it to your own area and capabilities.
Scenario: A major storm or earthquake-type event has disrupted commercial power and overloaded cellular service. Landline and internet access are unreliable. A shelter needs to report its status, request supplies, and ask about a medical transport. The net control station (NCS) must keep traffic organized while some stations drop out, some run on battery, and one repeater is unavailable.
Possible injects, introduced one at a time:
What I'd measure, beyond "did it work":
A caution on injects: it's tempting to pile on failures until the exercise feels chaotic. I think a better design changes one condition at a time so you can see which weakness caused which delay. Otherwise the debrief becomes a pile of anecdotes and nobody can tell what to fix.
Questions for everyone: What injects have exposed the most useful gaps in your drills? How do you keep an exercise realistic without turning it into a test people dread? And do you build in a hotwash right after, or wait until people have had time to reflect?
Link to comment
https://www.hamradiobase.com/forums/topic/10295-running-a-communications-failure-tabletop-what-should-we-inject-and-what-should-we-actually-measure/Share on other sites