Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 22
A 3
K 1 Quiet
X-Ray B1.3
Wind 338.5 km/s
Aurora 2
Updated 06:30 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Designing a comms exercise where the repeater goes down in hour two: what injects and lessons would you build in?

ci_cover.jpg

I'd like to compare notes on how we build disaster communication exercises so they test more than "can everyone check in." Here is a scenario skeleton to pick apart, and I'd like to hear what you would change.

The scenario: A multi-day flood event. Hour zero is a routine activation. The primary repeater is up, net control is on the main channel, and a few shelters and a county emergency operations center (EOC) are staffed. In hour two, commercial power drops at the repeater site and the backup runs on batteries of unknown condition. In hour three, the repeater drops off the air. Cell service is congested but not gone, so some traffic still gets through, just unreliably. Stations have to move to simplex, work out who can hear whom, and keep formal message traffic moving.

The point is to expose the weak spots before a real event does. These are the ones I'd want an exercise to surface:

First, fallback planning. Does everyone know the PACE order (primary, alternate, contingency, emergency) without looking it up? A plan that exists only in a binder usually fails the first time the primary goes away. A good inject is to remove the primary without warning and watch how long it takes the net to re-form. Time how long until net control has a usable roster again.

Second, tactical call signs and plain language. Tactical identifiers such as "Shelter North" or "EOC Liaison" let operators swap without confusing the net. They also reveal who is actually at which location. Avoid jargon and 10-codes that differ between agencies. Plain language is easier to teach and much less likely to be misread by a served agency.

Third, message handling. Passing a casual remark is easy. Passing a resource request with quantities, a location and a callback is harder. Use written message forms (ICS 213 or a local equivalent) and require readback on numbers, names and addresses. Seed the exercise with a few messages that are easy to garble, such as a street name with an unusual spelling, a medication name, or a count of cots plus a count of blankets.

Fourth, net discipline under load. When the repeater fails and everyone switches to simplex, you tend to get stations calling over each other, or everyone going quiet for fear of interfering. Net control should be able to call for emergency or priority traffic only, then re-open for routine check-ins. Practice "stand by" and "break" procedures deliberately.

Fifth, relay and coverage. If a shelter cannot reach net control directly, can a station in between relay? An inject worth using: one station is the only one that hears both ends. Does the net notice and use them, or does the traffic just stall?

Finally, the after-action review. A hot wash right after the exercise captures fresh observations, and a written after-action report with named owners for each improvement item keeps the findings from fading. I'd rather see three specific, assigned fixes than twenty general comments.

Questions for the group: what injects have you found most revealing? How do you balance a realistic scenario against a level of difficulty that keeps newer operators engaged? And how do you test power and endurance (batteries, fuel, antenna setup) without the exercise turning into a three-day campout?

  • Replies 2
  • Views 47
  • Created
  • Last Reply

Top Posters In This Topic

Featured Replies

One suggestion on the simulation side: write a short master scenario events list (MSEL) with timed injects, and assign someone who is not net control to run it. If the net control operator is also deciding when the repeater "fails," the exercise tends to drift toward what they already feel comfortable handling. A separate controller can also hold back injects if the net is overloaded, or add more if it is coping easily.

On your repeater failure, I'd split it into two versions. In one, everyone is told the repeater is down. In the other, it just goes silent and people have to work out why. The second is closer to reality, because operators often key up several times, assume their radio is the problem, and only later realize it's the infrastructure. How quickly the net moves from "is it me?" to "it's the repeater, go to the alternate" is a useful thing to measure.

Also consider injecting a bad or conflicting message: two shelters report different head counts, or a request arrives with no callback. It teaches operators to ask for clarification instead of passing along what they weren't sure they heard.

On the endurance question: you don't need a multi-day exercise to learn about power. Do a short, scripted "run on battery only" block. Operators set up on their own power, log what they are drawing, and estimate how long they could keep going. Even a one-hour block exposes things like missing fuses, wrong connectors, a radio left on high power, or a battery that hasn't been charged lately. The numbers matter less than finding out whether the kit is actually ready.

For newer operators, I'd pair them with a more experienced person in a support role rather than leaving them alone at a remote site. Let them handle the radio and message form while the partner watches the logging and the clock. Roles can swap midway. That keeps the pressure meaningful without teaching the lesson that a mistake is a disaster in itself.

One more thing to check in your scenario is how the served agency actually wants to receive information. If the EOC wants a brief status report on a set schedule and your net sends a stream of unstructured updates, the agency may simply stop listening. Ask them what format and timing are useful before the exercise, and make that part of the evaluation.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.