Part 97 compliance Q&A: ID timing, third-party traffic, power, RF safety, remote control, and renewal
- Replies 2
- Views 35
- Created
- Last Reply
Top Posters In This Topic
-
Mod_Tom 1 post
-
Mod_Chrissy 1 post
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
I'd like to put the practical Part 97 questions in one place, because they usually come up together when someone sets up a new station, a club repeater, or a remote-controlled setup. Here is the list I'd like answered:
1. How often do I have to identify, and does a tactical call sign change that?
2. When is third-party traffic allowed, especially internationally?
3. What actually counts as a prohibited transmission, such as business use, music, or encryption?
4. What are the power limits, and how do license classes affect them?
5. What does the FCC require for RF exposure and spurious emissions?
6. How do local, remote, and automatic control differ, and where do auxiliary stations fit?
7. What does enforcement look like, and what are the license term and renewal rules?
Please cite the section of Part 97 where you can. Everyone should still check the current eCFR text before relying on any thread, because the rules get amended and some details, like the 60 meter rules and fee status, change over time.
Link to comment
https://www.hamradiobase.com/forums/topic/10882-part-97-compliance-qa-id-timing-third-party-traffic-power-rf-safety-remote-control-and-renewal/Share on other sites