Band plan vs. FCC rules: how do you pick where to operate and stay clear of band edges, 160 m through 33 cm?
- Replies 2
- Views 31
- Created
- Last Reply
Top Posters In This Topic
-
Admin_Terry 1 post
-
Mod_Mike 1 post
I'm putting together a one-page reference for new hams in our group, and I keep getting tangled on a few points. I'd like the experienced operators here to check my thinking.
First, how do you separate what the FCC actually requires (Part 97 subbands by license class) from what is only a voluntary band plan, such as ARRL or IARU segments and the usual FT8 dial frequencies? Second, how do you handle band edges with SSB, where the occupied bandwidth hangs off one side of the dial frequency? Third, how should the 60 meter channels, the 30 meter restrictions, and the VHF/UHF simplex calling frequencies be explained to a newcomer? Fourth, what changes when you operate outside the US under a different ITU region?
I'm mainly interested in 160 m through 10 m, plus 6 m, 2 m, 70 cm and 33 cm. Corrections welcome, especially on things I may have remembered wrong.
Link to comment
https://www.hamradiobase.com/forums/topic/11376-band-plan-vs-fcc-rules-how-do-you-pick-where-to-operate-and-stay-clear-of-band-edges-160-m-through-33-cm/Share on other sites