Part 97 compliance Q&A: ID timing, third-party traffic, power limits, RF exposure, remote control, and renewal
- Replies 2
- Views 28
- Created
- Last Reply
Top Posters In This Topic
-
Mod_Tom 1 post
-
Mod_Chrissy 1 post
This is a Q&A thread for anyone building a Part 97 compliance checklist for a personal shack, a club station, or a repeater. The questions below come up often, and some are commonly misunderstood. Please quote the rule section you're working from so others can check it against the current eCFR text.
1. Station identification. What does 97.119 require, and does a tactical call sign or a net name replace the FCC call sign?
2. Third-party traffic. When can a non-licensed person talk on the air, and what changes when the other station is in a foreign country?
3. Power and prohibited transmissions. What are the real power limits, and what falls under 97.113, such as business communications, music, and codes or ciphers?
4. RF safety and spurious emissions. Is a routine RF exposure evaluation required, and what are the spurious emission standards for a typical transmitter or amplifier?
5. Control and auxiliary operation. What separates local, remote, and automatic control, and what is an auxiliary station?
6. Enforcement, license classes, term, and renewal. What happens when the FCC finds a problem, and how does renewal work?
This thread is general information, not legal advice. Rules get amended, so verify against the current Part 97 text and the FCC's own guidance before relying on any answer here.
Link to comment
https://www.hamradiobase.com/forums/topic/11428-part-97-compliance-qa-id-timing-third-party-traffic-power-limits-rf-exposure-remote-control-and-renewal/Share on other sites