Making SET and Field Day count: what should an after-action report capture, and how do we test message handling with served agencies?
- Replies 2
- Views 15
- Created
- Last Reply
Top Posters In This Topic
-
Admin_Terry 1 post
-
Mod_Tom 1 post
Most groups can describe their exercises in terms of participation: how many stations checked in, how many bands were used, how many contacts or messages went through. Those numbers are easy to collect, but they rarely tell you whether the group would perform well when a real hurricane, wildfire, flood, earthquake, tornado outbreak or long grid failure hits. I'd like to compare notes on how to design exercises, and write the after-action report (AAR), so the lessons are specific enough to change what we do next time.
Here are some starting points, and I'd like to hear where others disagree.
1. Start with a scenario that stresses one thing at a time. A generic "communications are down" premise produces a generic exercise. Hazards break different parts of the system:
Pick one or two of these as the primary challenge and write the injects (scripted events or messages that prompt action) around them.
2. Use Field Day as practice, but be honest about what it does and does not test. It is excellent for fast setup, portable power, antenna deployment, operating from a temporary site, logging discipline and teamwork. It is not, by default, a test of message handling or of working with an agency. If you want it to be useful for emergency preparedness, add a small side exercise: designate a message-handling station, introduce a few formal messages during the event, and require that they be sent and delivered correctly. Record what slowed things down.
3. Treat SET as a message-handling and coordination test, not only a contact-counting event. A Simulated Emergency Test works best when the group has a clear objective: for example, passing formal traffic accurately between nets, activating a net on short notice, or supporting a mock served-agency request. Decide before the exercise what a successful result looks like, such as "all messages delivered with no text changes" or "net activated and Net Control staffed within a set time."
4. Message handling is where small sloppiness becomes real errors. A standard radiogram has a preamble (message number, precedence, handling instructions if any, station of origin, check, place of origin, filing time and date), then address, text, and signature. The check is the word count, and it exists so the receiving station can detect a dropped or added word. Practice reading it correctly, using phonetics where needed, and spelling out numbers and unusual names. Many served agencies use ICS forms, such as the ICS-213 General Message, so it is worth practicing how a message arriving in one format gets converted into the other without changing its meaning.
Things I'd test on purpose: Does the originator write the message so that the operator doesn't have to guess? Is anyone tempted to "clean up" the text? Are priorities assigned appropriately, rather than everything being marked urgent? Are logs kept so that an operator can later answer "what was sent, when, to whom, and was receipt confirmed?" Something like an ICS-309 communications log is useful for this.
5. Net scripts should be short, readable under stress, and tested. A script that works on paper may fall apart at 2 a.m. when a tired operator is reading it. Check whether it covers opening, purpose, check-in categories (for example, emergency or priority traffic first, then regular check-ins), how to handle breaking stations, how to release stations, and how to close. Also include a plan for what happens when Net Control is lost: who takes over, on which frequency, and how that is announced.
6. Working with served agencies means exercising their way of working, not only ours. Before an event, clarify who the actual point of contact is, what the agency expects from communicators, what authority the volunteers have, where they will sit, and what information should never go out over amateur radio. Include a planned way of asking for what the agency really needs. During the exercise, a useful test is whether an agency staff member can hand over a message without needing to understand our procedures, and whether the answer comes back in a form they can use.
7. Write the AAR so that it changes something. A good AAR is not a thank-you note. At minimum, I'd include: the objectives and whether each was met; what was planned versus what happened; timeline highlights; what worked; what didn't; root causes; and corrective actions, each with an owner and a due date. Phrase findings as observations, not blame. "Net Control did not have a printed alternate frequency list" is more actionable than "Net Control was unprepared."
Questions for discussion: What objectives have you found most useful to measure? How do you keep a SET from turning into a casual roundtable? And what is the best way to get a served agency to give honest feedback in the AAR?
Link to comment
https://www.hamradiobase.com/forums/topic/11904-making-set-and-field-day-count-what-should-an-after-action-report-capture-and-how-do-we-test-message-handling-with-served-agencies/Share on other sites