Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 22
A 3
K 1 Quiet
X-Ray B1.3
Wind 338.5 km/s
Aurora 2
Updated 06:30 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Making SET and Field Day count: what should an after-action report capture, and how do we test message handling with served agencies?

ci_cover.jpg

Most groups can describe their exercises in terms of participation: how many stations checked in, how many bands were used, how many contacts or messages went through. Those numbers are easy to collect, but they rarely tell you whether the group would perform well when a real hurricane, wildfire, flood, earthquake, tornado outbreak or long grid failure hits. I'd like to compare notes on how to design exercises, and write the after-action report (AAR), so the lessons are specific enough to change what we do next time.

Here are some starting points, and I'd like to hear where others disagree.

1. Start with a scenario that stresses one thing at a time. A generic "communications are down" premise produces a generic exercise. Hazards break different parts of the system:

  • Hurricane: long-duration operations, shelter and welfare traffic, fuel and shift rotation, and a damaged area that may be unreachable from where you staff.
  • Wildfire: rapidly changing evacuation zones, repeater sites at risk, smoke and access limits, and a need for brief, accurate, timely information.
  • Flood: road closures that change who can reach which site, plus gauge and spotter reports.
  • Earthquake: no warning, widespread simultaneous damage, damaged infrastructure, and many stations wanting to check in at once.
  • Tornado: short-fuse spotter and damage reporting, often followed by a surge of welfare traffic.
  • Grid failure: backup power depletion at repeaters, hospitals and shelters, which shifts the problem to endurance.

Pick one or two of these as the primary challenge and write the injects (scripted events or messages that prompt action) around them.

2. Use Field Day as practice, but be honest about what it does and does not test. It is excellent for fast setup, portable power, antenna deployment, operating from a temporary site, logging discipline and teamwork. It is not, by default, a test of message handling or of working with an agency. If you want it to be useful for emergency preparedness, add a small side exercise: designate a message-handling station, introduce a few formal messages during the event, and require that they be sent and delivered correctly. Record what slowed things down.

3. Treat SET as a message-handling and coordination test, not only a contact-counting event. A Simulated Emergency Test works best when the group has a clear objective: for example, passing formal traffic accurately between nets, activating a net on short notice, or supporting a mock served-agency request. Decide before the exercise what a successful result looks like, such as "all messages delivered with no text changes" or "net activated and Net Control staffed within a set time."

4. Message handling is where small sloppiness becomes real errors. A standard radiogram has a preamble (message number, precedence, handling instructions if any, station of origin, check, place of origin, filing time and date), then address, text, and signature. The check is the word count, and it exists so the receiving station can detect a dropped or added word. Practice reading it correctly, using phonetics where needed, and spelling out numbers and unusual names. Many served agencies use ICS forms, such as the ICS-213 General Message, so it is worth practicing how a message arriving in one format gets converted into the other without changing its meaning.

Things I'd test on purpose: Does the originator write the message so that the operator doesn't have to guess? Is anyone tempted to "clean up" the text? Are priorities assigned appropriately, rather than everything being marked urgent? Are logs kept so that an operator can later answer "what was sent, when, to whom, and was receipt confirmed?" Something like an ICS-309 communications log is useful for this.

5. Net scripts should be short, readable under stress, and tested. A script that works on paper may fall apart at 2 a.m. when a tired operator is reading it. Check whether it covers opening, purpose, check-in categories (for example, emergency or priority traffic first, then regular check-ins), how to handle breaking stations, how to release stations, and how to close. Also include a plan for what happens when Net Control is lost: who takes over, on which frequency, and how that is announced.

6. Working with served agencies means exercising their way of working, not only ours. Before an event, clarify who the actual point of contact is, what the agency expects from communicators, what authority the volunteers have, where they will sit, and what information should never go out over amateur radio. Include a planned way of asking for what the agency really needs. During the exercise, a useful test is whether an agency staff member can hand over a message without needing to understand our procedures, and whether the answer comes back in a form they can use.

7. Write the AAR so that it changes something. A good AAR is not a thank-you note. At minimum, I'd include: the objectives and whether each was met; what was planned versus what happened; timeline highlights; what worked; what didn't; root causes; and corrective actions, each with an owner and a due date. Phrase findings as observations, not blame. "Net Control did not have a printed alternate frequency list" is more actionable than "Net Control was unprepared."

Questions for discussion: What objectives have you found most useful to measure? How do you keep a SET from turning into a casual roundtable? And what is the best way to get a served agency to give honest feedback in the AAR?

  • Replies 2
  • Views 15
  • Created
  • Last Reply

Top Posters In This Topic

Featured Replies

  • Administrators

One thing I'd add to the AAR section is separating "capability gaps" from "procedure gaps," because they get fixed differently. If a station couldn't reach Net Control because of antenna, power or propagation problems, that's a capability issue, and the fix might be equipment, a different band, or a relay. If the station could be heard but the message was garbled or incomplete, that's a procedure and training issue. Mixing them in one list makes the report look like a to-do list with no priorities.

On message handling, a good drill is to have the originator hand a message to a different operator, and then have the receiving end write down what it understood without seeing the original. Compare them afterward. The differences are usually in numbers, names, addresses and anything with an unfamiliar spelling. It's low-tech, but it shows exactly where your read-back habits need work.

For served agencies, I'd treat the first meeting as an interview rather than a pitch: ask what information they've struggled to move in past incidents, what forms they use, and what they're not allowed to send over an unsecured channel. Then build the injects around their answers instead of ours.

  • Moderators

I agree about testing endurance, not just startup. Field Day is usually a sprint of a day or so, whereas a hurricane or grid-down event can run for days. If your group only ever practices the first few hours, you won't discover problems with shift scheduling, battery rotation, fuel logistics, food and water for operators, or the way handover notes degrade when people are tired. Even a short exercise can include a mandatory shift change with a written handover, and then you can see what the incoming operator actually knew.

On net scripts, I'd also suggest having one version for "ordinary" operation and a stripped-down one for when the net is overloaded. A surge of check-ins after something like an earthquake or tornado can swamp a normal roll call. A simple rule, such as taking only emergency or priority traffic and listing others for later, needs to be written in advance so Net Control isn't inventing the policy on the air.

One caution on the AAR: keep a clear difference between what the exercise showed and what the group assumes. If a repeater was not tested, don't claim the repeater plan works. "Not tested" is a legitimate finding and often a useful one.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.