Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 33
A 3
K 1 Quiet
X-Ray B1.3
Wind 322.7 km/s
Aurora 2
Updated 12:00 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Turning SET and Field Day into real practice: scenarios, message handling, and after-action reports that get used

ci_cover.jpg

Most clubs treat the Simulated Emergency Test and Field Day as events to get through rather than rehearsals to learn from. The contact count gets posted, the gear goes back in the closet, and the same gaps show up at the next exercise. I'd like to collect ideas on how to design these events so they produce lessons a group can act on.

Here is a starting framework, and I'd like people to pick it apart.

1. Pick one hazard and let it set the constraints. A hurricane scenario implies long-duration operations, fuel and battery logistics, shelter traffic, and possibly damaged repeaters. A wildfire implies evacuations, shifting boundaries, and poor line-of-sight in terrain. Flooding means road closures and a need to move people and information around obstacles. An earthquake means sudden, widespread loss of infrastructure and many simultaneous demands. A tornado is a short, violent event with a fast hand-off from spotting to damage assessment. A grid failure is slower and quieter, with cascading effects such as dead cell sites, generators running dry, and fuel for repeater sites. Each of these should change who you talk to, which bands and modes you use, and what a useful message looks like.

2. Inject problems, not just traffic. A net that passes 40 clean messages on a working repeater teaches less than one where the primary repeater is declared down at the 30-minute mark. Useful injects include a net control operator who has to hand off mid-exercise, a served-agency contact who gives an ambiguous request, a message with a garbled number, a shelter that needs a resource request in a format it did not expect, and a band that goes unusable. Write the injects down in advance, with a time and an intended learning point for each, so the exercise controller isn't improvising.

3. Practice message handling with more than one format. NTS radiograms have a defined structure: message number, precedence, handling instructions, station of origin, check (word count), place of origin, filing time and date, then the address, text, and signature. The check is easy to get wrong, and a wrong check is how you find out whether the receiving station is actually counting words. Many served agencies work with ICS-213 general message forms instead. A good exercise has operators convert between the two without losing meaning. Precedence also deserves practice: emergency, priority, welfare, and routine mean different things, and under load operators tend to assume everything is priority.

4. Script the net, but test whether the script survives contact. A net script should cover opening statement, purpose, check-in procedure (for example, a call for stations with emergency or priority traffic first), roll of assigned stations, traffic handling, directed-net discipline, relay stations, and a closing with next net time. Ask whether a new net control operator could run it cold at 3 a.m. If not, shorten it and put the check-in steps in order of importance.

5. Use Field Day as practice for the parts that Field Day is good at. It is a decent rehearsal for fast deployment, power (generators, batteries, solar), antenna work, station layout, logging discipline, and operating under mild discomfort. It is less useful for served-agency coordination unless you add some structure. One option is to run a formal message-passing table alongside the contact-making stations, with a few scripted messages that must be copied accurately and delivered to a named recipient. Another is to treat setup time as a metric: how long from arrival to the first valid contact, and how long to a fully functional digital station?

6. Write the after-action report while the exercise is still fresh. A format that stays readable: scenario and objectives, participants and roles, what was planned versus what happened, what worked, what did not, root causes, and corrective actions with an owner and a target date. The last part matters most. A list of observations with no owners is a diary entry. Separate equipment problems from procedure problems from people problems, because the fixes differ. Also record near-misses, such as a message that was nearly lost but got caught by a sharp operator, since those show where the system depends on individuals instead of process.

7. Treat served agencies as participants, not an audience. Ask them beforehand what they would want from amateur radio in a real event, which forms they use, who the point of contact is, and what they absolutely do not want volunteers to do. Invite someone from the agency to critique the traffic afterward. Operators sometimes assume the agency needs more information than it does, and the agency may be quietly annoyed by the volume of messages.

Questions for the thread: What injects have you found expose weaknesses fastest? How do you balance training new operators with testing experienced ones? And what would make your after-action report something the club reads again in six months?

  • Views 3
  • Created
  • Last Reply

Featured Replies

No posts to show

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.