Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 87
SN 33
A 10
K 1 Quiet
X-Ray B1.5
Wind 363.6 km/s
Aurora 1
Updated 00:00 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Fair 17/15m Poor 12/10m Poor
Night 80/40m Good 30/20m Fair 17/15m Poor 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Using SET and Field Day to Practice for Real Disasters: Net Scripts, Message Handling, and Served-Agency Realism

ci_cover.jpg

Most emergency communication groups agree that drills matter, but a drill can easily become a pleasant on-air exercise that doesn't test the things that fail in a real event. I'd like to compare notes on how to build exercises around real disaster scenarios (hurricane, wildfire, flood, earthquake, tornado, extended grid failure) so that the Simulated Emergency Test and Field Day do more than log contacts.

Start with the scenario, because it changes what you practice. A hurricane is mostly a slow-build problem: pre-landfall staging, shelter support, then days of degraded infrastructure. A tornado or earthquake is a no-notice problem, where the first hour is about finding out who is alive, who has power, and which repeaters are still up. A wildfire shifts constantly with wind and evacuation zones, so your communication plan has to cope with moving assets and changing served-agency priorities. A flood often leaves repeater sites reachable one day and cut off the next. A grid failure tests battery capacity, generator fuel, and how long you can keep a net running without burning out operators. If every exercise is a generic "disaster," you'll keep rehearsing the same easy parts.

Field Day is useful practice, but only for certain skills. It exercises rapid setup, portable power, antenna deployment, operating off-grid, and working in less-than-ideal conditions. It does not by itself exercise message handling, accountability, or agency liaison. Groups that get the most from it add a deliberately separate piece: a message-handling table, a mock shelter or EOC position, or a short period where operators must pass formal traffic instead of just exchanging contest-style information. Treat the station build as the training and the traffic as the test.

On net scripts, the goal is that a stressed operator who has never run a net can still run one. A good script includes the net's purpose, the opening statement, how to check in (emergency or priority traffic first, then others), how to request relays, how to handle a station with a message, and a clear closing procedure. Keep it to a page. Use plain language, tactical call signs tied to the location or function (for example "Shelter North" rather than a personal call), and still identify with your FCC call sign at the required intervals. Test the script with someone who didn't write it. Gaps show up immediately.

Message handling is where many exercises quietly fall apart. Decide ahead of time which formats you'll use. The ARRL radiogram format (number, precedence, handling instructions, station of origin, check, place of origin, filing time and date, addressee, text, signature) is built for relaying through multiple stations and counting words so errors can be caught. Many served agencies use ICS-213 General Message forms instead. Your operators should be able to move content between the two without changing the meaning. Practice the unglamorous parts too: reading numbers and call signs clearly with phonetics, repeating critical details back, keeping the text short, and flagging anything that looks like a health-and-welfare inquiry versus an operational request, since they get handled differently.

Working with served agencies is the part you can't fully simulate among hams alone. If you can, bring in the Red Cross, emergency management, a hospital, or a National Weather Service liaison to supply realistic requests, even if only as scripted injects. Ask them what they need in a message, who is authorized to send one, and who your operator reports to. Written agreements or MOUs, where they exist, should be read by the operators who will actually be deployed. Also rehearse the awkward case: an agency asks for something outside what amateur radio can or should do, or a message is sent that you can't legitimately transmit. Operators should know how to decline politely and escalate to a net control or EC.

After-action reports are what turn an exercise into improvement. A workable structure: the scenario and objectives, what was planned, what actually happened, what worked, what didn't, root causes, and specific corrective actions with an owner and a target date. Keep it blame-free and focused on systems. Vague statements like "communication could be better" aren't helpful. Something like "two relay stations used different message formats, delaying delivery" points to a fix. Share the report with participating agencies, not just the club.

Questions for the group: What injects have you found most effective for exposing weak points? How do you balance letting new operators run the net with keeping the exercise realistic? And how do you get a served agency to take part in an exercise rather than just attend the debrief?

  • Replies 2
  • Views 8
  • Created
  • Last Reply

Top Posters In This Topic

Featured Replies

  • Moderators

One thing worth building into any scenario is a communications-loss inject partway through. For example, the primary repeater is declared down, or the net control station's power fails, and the net has to move to simplex or an alternate frequency using the plan on paper. It's easy to write a backup plan and never discover that half the operators don't have the alternate frequency programmed, or that nobody knows who takes over as net control. Pre-assign an alternate NCS and make sure the handoff is announced clearly on the air.

For message handling, I'd also suggest using a few deliberately imperfect messages: one with an unclear addressee, one with a number that doesn't match its check count, one that's far too long for the circuit. Seeing how operators catch and correct these is much more instructive than watching clean messages pass through. Just brief everyone afterward so nobody feels tricked.

  • Moderators

On the served-agency side, I'd focus first on the interface rather than the radios. Who physically hands your operator a message at the shelter or EOC? Who signs off that it was delivered? Who decides priority? If those answers are fuzzy, the best HF or VHF network in the world just moves confusion faster. A short pre-exercise meeting with the agency contact to agree on a simple handoff procedure is often more valuable than another round of net practice.

For getting agencies to participate, it can help to ask for small things: ten scripted messages, one person for a two-hour window, a quick review of your form. People are more willing to commit to a limited request. And keep the debrief short and concrete, with two or three findings they can act on, so they see the exercise as useful to them rather than a hobby event they were invited to watch.

Also, for SET specifically, remember that the national exercise is a framework. Local groups can adapt the scenario and objectives to local hazards, so a coastal group, a wildfire-prone area, and an inland tornado region don't need to run the same drill.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.