Using SET and Field Day to Practice for Real Disasters: Net Scripts, Message Handling, and Served-Agency Realism
- Replies 2
- Views 8
- Created
- Last Reply
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
Most emergency communication groups agree that drills matter, but a drill can easily become a pleasant on-air exercise that doesn't test the things that fail in a real event. I'd like to compare notes on how to build exercises around real disaster scenarios (hurricane, wildfire, flood, earthquake, tornado, extended grid failure) so that the Simulated Emergency Test and Field Day do more than log contacts.
Start with the scenario, because it changes what you practice. A hurricane is mostly a slow-build problem: pre-landfall staging, shelter support, then days of degraded infrastructure. A tornado or earthquake is a no-notice problem, where the first hour is about finding out who is alive, who has power, and which repeaters are still up. A wildfire shifts constantly with wind and evacuation zones, so your communication plan has to cope with moving assets and changing served-agency priorities. A flood often leaves repeater sites reachable one day and cut off the next. A grid failure tests battery capacity, generator fuel, and how long you can keep a net running without burning out operators. If every exercise is a generic "disaster," you'll keep rehearsing the same easy parts.
Field Day is useful practice, but only for certain skills. It exercises rapid setup, portable power, antenna deployment, operating off-grid, and working in less-than-ideal conditions. It does not by itself exercise message handling, accountability, or agency liaison. Groups that get the most from it add a deliberately separate piece: a message-handling table, a mock shelter or EOC position, or a short period where operators must pass formal traffic instead of just exchanging contest-style information. Treat the station build as the training and the traffic as the test.
On net scripts, the goal is that a stressed operator who has never run a net can still run one. A good script includes the net's purpose, the opening statement, how to check in (emergency or priority traffic first, then others), how to request relays, how to handle a station with a message, and a clear closing procedure. Keep it to a page. Use plain language, tactical call signs tied to the location or function (for example "Shelter North" rather than a personal call), and still identify with your FCC call sign at the required intervals. Test the script with someone who didn't write it. Gaps show up immediately.
Message handling is where many exercises quietly fall apart. Decide ahead of time which formats you'll use. The ARRL radiogram format (number, precedence, handling instructions, station of origin, check, place of origin, filing time and date, addressee, text, signature) is built for relaying through multiple stations and counting words so errors can be caught. Many served agencies use ICS-213 General Message forms instead. Your operators should be able to move content between the two without changing the meaning. Practice the unglamorous parts too: reading numbers and call signs clearly with phonetics, repeating critical details back, keeping the text short, and flagging anything that looks like a health-and-welfare inquiry versus an operational request, since they get handled differently.
Working with served agencies is the part you can't fully simulate among hams alone. If you can, bring in the Red Cross, emergency management, a hospital, or a National Weather Service liaison to supply realistic requests, even if only as scripted injects. Ask them what they need in a message, who is authorized to send one, and who your operator reports to. Written agreements or MOUs, where they exist, should be read by the operators who will actually be deployed. Also rehearse the awkward case: an agency asks for something outside what amateur radio can or should do, or a message is sent that you can't legitimately transmit. Operators should know how to decline politely and escalate to a net control or EC.
After-action reports are what turn an exercise into improvement. A workable structure: the scenario and objectives, what was planned, what actually happened, what worked, what didn't, root causes, and specific corrective actions with an owner and a target date. Keep it blame-free and focused on systems. Vague statements like "communication could be better" aren't helpful. Something like "two relay stations used different message formats, delaying delivery" points to a fix. Share the report with participating agencies, not just the club.
Questions for the group: What injects have you found most effective for exposing weak points? How do you balance letting new operators run the net with keeping the exercise realistic? And how do you get a served agency to take part in an exercise rather than just attend the debrief?
Link to comment
https://www.hamradiobase.com/forums/topic/12060-using-set-and-field-day-to-practice-for-real-disasters-net-scripts-message-handling-and-served-agency-realism/Share on other sites