Designing a comms-failure drill: what should the scenario actually test?
- Replies 1
- Views 76
- Created
- Last Reply
Top Posters In This Topic
-
Emily Thomas 1 post
-
Kenneth Lopez 1 post
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
I'd like to compare notes on how to build a communication exercise that is more than a roll call with a theme. Here is a scenario skeleton to pick apart.
A winter storm has taken down commercial power across a region. Cell service is patchy because sites are running on battery and the networks are congested. The county EOC is up on generator power. Two shelters have opened, and a hospital wants to know which routes are passable for supply deliveries. The primary VHF repeater is working, but the site is on backup power with an unknown runtime. Operators are told to assume it could drop out partway through the exercise.
The easy version of this drill is a net: control calls for check-ins, everyone answers, a few canned messages are passed, and the exercise ends. That tests whether people can key a mic on schedule. It says little about whether information moves accurately from a shelter to the EOC and back, which is the point of the whole system.
These are the things I think a better scenario should force:
First, a fallback when the repeater goes away. Is there a written plan for moving to simplex or an alternate repeater, and do people know the trigger for switching? A PACE structure (primary, alternate, contingency, emergency) is useful here, but only if each level names a specific frequency or method, not just "try something else."
Second, message handling under load. Shelter requests, resource requests and status reports should arrive close together so net control has to prioritize. Is anyone using a standard form such as ICS-213 or the group's equivalent? Are messages read back, and are the logs good enough that someone arriving at the next shift can tell what is still open?
Third, a degraded or confusing situation. Conflicting reports about the same road, a request that is clearly mis-prioritized, or a station that can hear net control but can't be heard. Those moments reveal more than clean traffic does.
I'd like to hear how others structure injects, and what you would add or drop. Do you script the repeater failure, or let it happen as a surprise to the participants? How much should the exercise tell people in advance?
Link to comment
https://www.hamradiobase.com/forums/topic/8501-designing-a-comms-failure-drill-what-should-the-scenario-actually-test/Share on other sites