Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 33
A 3
K 1 Quiet
X-Ray B1.3
Wind 318.7 km/s
Aurora 2
Updated 11:30 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Stepping down the comms ladder: building disaster communication drills that expose real gaps

blogs_cover.webp

A lot of communication drills fail in a predictable way. Everything works because the repeater is up, the net control station has a good signal, and the messages are short and already written. The exercise gets marked a success, and nobody learns what happens when the primary path disappears.

Here is a scenario for discussion. A widespread power outage hits a region after a storm. Cell service is congested, then patchy, then effectively unusable in some areas. The main VHF repeater is running on battery or generator backup, and its status is uncertain. A shelter, a hospital, and an emergency operations center all need to exchange resource requests and status reports. Volunteer operators are deploying from home, and some of them have never worked with each other.

What should a good exercise built on that scenario test? Here are a few possible focus areas, and I would like to hear what others would add or cut:

First, the PACE structure (primary, alternate, contingency, emergency). Many groups have a plan on paper, but few rehearse the actual transition. How do stations know the repeater has failed and not just that they have a weak signal? Who makes the call to move to simplex, and how is that announced to stations that cannot hear net control?

Second, message discipline. Do operators use tactical call signs, plain language, and readbacks for critical items like quantities, addresses, and names? Is traffic passed on a standard form such as ICS-213 or a local equivalent, or does it turn into a loose conversation that nobody can log afterward?

Third, the served agency interface. Operators often assume the agency knows what amateur or volunteer radio can and cannot do. Does anyone brief the shelter manager on turnaround times, message length, and what happens when traffic backs up?

Fourth, endurance. A four-hour drill hides problems with fatigue, battery management, shift relief, and log handoffs that show up on hour fourteen of a real event.

For those who design or evaluate exercises: what is the one inject you would add that most drills skip? And how do you measure whether the exercise taught anything beyond whether people showed up and checked in?

  • Replies 1
  • Views 88
  • Created
  • Last Reply

Top Posters In This Topic

Featured Replies

One thing that helps is degrading the system in stages instead of announcing a single big failure. Start with normal repeater operation, then add an inject that says the repeater is unusable, then another saying net control's antenna is down and a backup station must take over. Each stage tests a different assumption, and the transitions are where the confusion shows up.

Controllers matter as much as the scenario. If a few people are assigned to play the shelter, hospital, and EOC, and they are allowed to react realistically, you find out quickly whether operators ask clarifying questions or just pass garbled text along. A scripted message list is fine for the first round, but have controllers occasionally send something ambiguous on purpose, such as a quantity with no unit or a location with no cross street, and see who catches it.

For measurement, simple counts beat impressions. How long did it take to establish a net after the activation message? How many messages needed a repeat or correction? How many were delivered to the right recipient on the first try? Was every message logged with a time and the operator's name? Write those down during the exercise, then use them in the hot wash so the discussion is about observations and not memory. The Homeland Security Exercise and Evaluation Program (HSEEP) approach of defining objectives first and evaluating against them is a useful structure even for a small volunteer group, as long as you keep the paperwork proportional.

The gaps that tend to be reported most often in after-action discussions are not exotic. They are things like operators who do not identify properly, free-form messages with no addressee, nobody tracking who is on the net, and relief operators who arrive with no handoff. If your exercise only tests whether a message can be sent once, you will miss most of that.

I would add a relay inject. Make direct contact between two points impossible, for example by saying terrain blocks the path between the shelter and the EOC, so a third station has to relay. This forces people to practice breaking traffic into manageable pieces, confirming receipt at each hop, and keeping accurate logs. It also shows whether stations can hear each other on simplex at all, which is something you cannot assume until you test it.

Power and equipment deserve their own injects. Tell a station its battery is at a certain level and the generator will not start, then see whether they have a plan or just go off the air without telling anyone. Operators should know when to say they are going down and who will cover. Same with digital modes: if your plan includes them, run a segment where they are the only option, and a segment where they fail and everyone falls back to voice. A tool nobody has tried under pressure is not really part of the plan.

Last, keep a short list from each exercise of changes you will actually make, with a name and a date next to each. A hot wash that produces ten observations and zero assigned fixes tends to repeat the same lessons at the next drill.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.