Designing a comms-down exercise: which injects actually test your radio plan?
- Replies 1
- Views 83
- Created
- Last Reply
Top Posters In This Topic
-
Bob Williams 1 post
-
Sarah Williams 1 post
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
I'd like to get opinions on building a communications exercise that tests more than whether people can check into a net on a sunny afternoon. Here is a hypothetical scenario to react to.
A major windstorm has knocked out commercial power across a county. Cell service is congested and degrading as backup batteries at the sites run down. The EOC is up on generator power. Two shelters have opened, and one hospital is asking for a way to pass logistics traffic if its normal phone lines fail. The volunteer radio group is asked to staff the EOC, both shelters and the hospital, with a net running on a primary repeater.
On paper that is a clean setup. The question is what the exercise should do to break it, because an exercise that never strains the plan only shows that the plan works when nothing goes wrong.
Here are the areas I think are worth testing, roughly in order of how often plans seem to fail on them:
1. The PACE plan. Primary, Alternate, Contingency, Emergency. Most groups can name a primary repeater and a simplex fallback. Fewer have written down the third and fourth options, or have tested whether every station can reach them. If the primary goes away mid-exercise, how long does it take the net to reassemble elsewhere, and does everyone know the trigger for moving?
2. Net control continuity. What happens if net control drops off the air, loses power, or simply gets overloaded? Is there a designated alternate NCS who is already listening, or does the net sit in silence while people wonder whether to speak up?
3. Message handling. Passing a message verbally is one thing. Passing a written message accurately through a relay, with names, quantities and locations intact, is another. Using a standard form such as the ICS-213 General Message, with a readback on critical items, makes errors visible instead of leaving them hidden.
4. Tactical call signs and plain language. Using location-based tactical identifiers like "Shelter One" and "EOC" while still giving legal station identification at the required intervals is easy to say and surprisingly easy to forget when traffic picks up. Jargon and Q-signals that the served agency doesn't understand are a related problem.
5. Station endurance. Power, antennas, spare batteries, a written log (an ICS-309 Communications Log works well) and a plan for operator rest. A scenario that runs only two hours will never show you a fatigue problem.
What injects have you found, or would you design, that stress these areas without turning the exercise into a scripted performance? I'm especially interested in how to handle the balance between realism and keeping participants from feeling set up to fail.
Link to comment
https://www.hamradiobase.com/forums/topic/8658-designing-a-comms-down-exercise-which-injects-actually-test-your-radio-plan/Share on other sites