Cell towers down, repeater silent: what should a comms exercise actually test?
- Replies 1
- Views 108
- Created
- Last Reply
Top Posters In This Topic
-
DX Hunter 1 post
-
Linda Rodriguez 1 post
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
I'd like to compare notes on how people design disaster communication exercises, because many of them seem to test whether the radios turn on rather than whether information moves to the right people.
Here is a scenario to pick apart. A widespread power outage hits during a storm. Cell service is congested and then degrades as backup batteries at sites run down. The main VHF repeater is off the air, with cause unknown. A shelter, a hospital, an emergency operations center, and two field teams all need to exchange information. What should the exercise measure?
My starting list is below. Tell me what you'd add, cut, or reorder.
First, the fallback plan. If the repeater is down, does everyone know the next step without being told? A PACE-style plan (primary, alternate, contingency, emergency) is useful only if it is written down and each layer has been tried. Switching to a simplex frequency sounds easy until half the stations can't reach net control directly and nobody has decided who relays.
Second, net discipline under load. Check-ins tend to go well when five stations are on the air and badly when fifteen call at once. Does net control take short-time or priority traffic first? Do stations stay off the air when they have nothing to report? Does anyone use "break" or "priority traffic" correctly, and is it honored?
Third, message quality. A voice report like "we need help at the shelter" is not actionable. Can operators pass who, what, where, how many, and what is needed, in plain language, with read-back on numbers, names, and addresses? Using phonetics for unusual words and saying "say again" instead of guessing both matter more than most people expect.
Fourth, recordkeeping. If a request is passed by voice and nobody logs it, did it happen? Standard forms such as an ICS-213 general message or an ICS-309 communications log are worth practicing, even clumsily, because the paper trail is what lets a shift change happen without losing requests.
Fifth, endurance. A one-hour drill hides problems with battery life, antenna placement, operator fatigue, and shift handoff. Even a partial test of running on battery or generator power for several hours will expose things a short drill never does.
What would you build into the scenario so that the weak points show up instead of being politely avoided?
Link to comment
https://www.hamradiobase.com/forums/topic/8786-cell-towers-down-repeater-silent-what-should-a-comms-exercise-actually-test/Share on other sites