Designing a comms exercise that breaks things on purpose: what should the scenario test?
- Replies 1
- Views 71
- Created
- Last Reply
Top Posters In This Topic
-
Robert Williams 1 post
-
Kevin Brown 1 post
A better way to browse. Learn more.
A full-screen app on your home screen with push notifications, badges and more.
I'm sketching a communications exercise for a volunteer group and want input before locking the scenario. The premise is a multi-day ice storm: widespread power loss, cell sites running down on battery and then dropping off, one main repeater on generator power, and a couple of shelters and a county EOC that all need to exchange information.
My concern is that many exercises turn into a big roll call. Everyone checks in, signals are good, everyone goes home feeling fine, and nothing was stressed. I'd rather build in controlled failures and see how the net handles them. Right now the plan has four parts:
First, start in a degraded state. Assume cell service is unreliable from the beginning, so participants can't quietly text each other the answers. Stations use tactical call signs tied to location (for example "Shelter North" or "EOC") instead of personal call signs, with FCC-required identification still done properly.
Second, use written traffic. Shelter stations get a handful of scripted requests: resource needs, a status update, a welfare inquiry. Each one has to be passed as a formal message (ICS-213 or whatever form your served agency uses) and read back accurately. The messages are clearly labeled as exercise traffic and use no real personal information.
Third, run timed injects. About two hours in, the main repeater "fails" and the net has to move to a backup frequency, simplex, or a relay arrangement. Later, a served-agency player asks for a shelter status update within ten minutes, to see whether net control can prioritize and route traffic or whether it just goes first come, first served.
Fourth, measure something concrete. I'm thinking of time from message origination to confirmed delivery, how many repeats or clarifications each message needed, and whether the final text matched what was sent. Those seem more useful than a count of check-ins.
What am I missing? In particular, how do you handle the "repeater is down" inject so it feels real without leaving half the group unable to hear anyone and just sitting there?
Link to comment
https://www.hamradiobase.com/forums/topic/8820-designing-a-comms-exercise-that-breaks-things-on-purpose-what-should-the-scenario-test/Share on other sites