Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 22
A 3
K 0 Quiet
X-Ray B1.3
Wind 336.5 km/s
Aurora 2
Updated 07:00 UTC HamQSL · N0NBH
Day 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Designing a comms-failure exercise: which injects actually expose weak points?

ci_cover.jpg

I'm sketching a tabletop-plus-radio exercise built around a fairly ordinary scenario: a severe storm knocks out commercial power across a region, cell sites are congested or running on limited battery, and the main repeater is off the air. The served agency (say, a shelter operation and an emergency operations center) needs to move information between sites. The goal is not to "win" the scenario but to find where the communication plan bends or breaks.

Here is the structure I'm leaning toward. Start with a normal-looking activation and a check-in net. Then, over a couple of hours of exercise time, introduce problems one at a time instead of all at once. Good candidates: the repeater goes down and everyone has to move to simplex; net control loses power or has to hand off to an alternate; a shelter manager asks for a resource using vague language; two stations report conflicting information about the same road closure; and a welfare inquiry arrives that is clearly lower priority than a medical request but arrives first.

I want to build the plan around PACE (primary, alternate, contingency, emergency) so participants have to actually step down through methods rather than just talk about it. For example: primary is the repeater, alternate is a simplex frequency with a designated relay station, contingency is a different band or mode, and emergency is a runner or written message delivery. Whether anyone remembers to announce the change, and whether everyone follows, tends to be the revealing part.

A few things I'd like opinions on. First, how much plain language versus shorthand should be enforced? I lean toward plain language and tactical call signs with proper station identification at the required intervals, because mixed agencies don't share codes. Second, how do you handle message formality? Requiring a written form such as an ICS 213 or radiogram-style format for anything leaving the net slows things down, but it also shows who is dropping details like origin, time, and addressee. Third, what injects have you seen (or would you design) that test people without turning the exercise into a trick?

I'd also like to avoid an exercise where the same two experienced operators carry everything. Ideas for forcing role rotation without wrecking the flow are welcome.

  • Replies 1
  • Views 72
  • Created
  • Last Reply

Top Posters In This Topic

Featured Replies

On injects, I'd favor ones that create ambiguity rather than pure equipment failure. A dead repeater is easy to understand; a message that says "we need help at the school on the east side" is where net discipline gets tested. Does the receiving station say "say again" and ask for a street address, a callback method, and a priority? Or do they write it down as is and pass it along? Having a controller deliberately give an incomplete message and then see how it propagates through relay stations can show a lot.

For message handling, I'd have net control insist on read-back for anything involving numbers, locations, or resource quantities. It sounds tedious, but it catches the classic problems: transposed digits, similar-sounding street names, and mismatched units. Also use the prowords consistently. "Break" to separate parts of a transmission, "priority traffic" or "emergency traffic" to preempt, "stand by" when you truly can't take the message yet. If people are using them loosely during the exercise, that's worth noting in the debrief rather than correcting every time on the air.

For rotation, you can build it into the schedule: announce that net control changes at a set exercise time, and require a short handoff covering active stations, open requests, and pending messages. Poor handoffs are a very common weak point because the outgoing operator carries everything in their head.

I'd add two things: scope your evaluation, and plan the debrief before the exercise. Decide in advance what you're actually measuring. Examples: time to establish net after activation, whether stations followed the PACE steps, whether messages arrived with origin, time, addressee, and content intact, and whether the log can reconstruct what happened. If you try to evaluate everything, evaluators end up with impressions instead of notes.

Put an evaluator at net control and at least one at a served-agency site, and have them timestamp events by hand. That matters because memory after the fact is unreliable, and a written log shows gaps that people would not otherwise notice, like a request that was acknowledged but never closed out.

On logistics, the power injects are worth including even in a short exercise. Ask stations to state their power source and how long it can run, and have a controller announce that a site's generator has failed. That prompts the conversation about spare batteries, fuel, antennas that don't depend on mains power, and whether anyone has a paper copy of the frequency plan and contact list. Scenarios often assume the plan lives on a phone or laptop, and that assumption is the thing to test.

For the debrief, I'd keep it structured: what was supposed to happen, what did happen, why the difference, and what specific change will be made to a plan, a template, or a training session. Ending with a named owner and a due date for each fix makes the exercise more useful than a general discussion of what went well.

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.