Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 35
A 3
K 1 Quiet
X-Ray B1.4
Wind 331.2 km/s
Aurora 1
Updated 15:30 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

Carlos Gutierrez

Members
  • Joined

  • Last visited

  1. This thread is for the practical decisions behind a homebrew wire antenna, from the first length calculation to checking the result with an analyzer. A few topics come up again and again: wire choice, supports, feedpoint hardware, common-mode current, radials, and how far to trust a model. Here is a starting framework. Please push back where your experience differs. Wire and length. For a half-wave dipole, 468 divided by the frequency in MHz gives a length in feet. At 7.1 MHz that is about 65.9 ft overall. Treat it as a first cut, not a final answer. Insulated wire, nearby trees, a sloping layout, and low height all shift resonance, and insulation usually pulls it lower. The usual advice is to cut long, then trim symmetrically from the ends while watching an analyzer. For gauge, 14 AWG hard-drawn or copper-clad steel suits long permanent spans because it resists stretching. Soft-drawn copper stretches and the antenna slowly goes out of tune. Stranded 14 to 18 AWG is easier for portable or temporary work, and lighter wire is gentler on a fiberglass pole. Weight and wind loading matter more than resistive loss at HF for typical dipole lengths. Insulators and supports. Anything that holds tension and does not absorb water or break down in sunlight will do. Common choices are ceramic or UV-stabilized plastic egg and dogbone insulators, cut acrylic or HDPE sheet, and PVC offcuts. For rope, use polyester or UV-rated Dacron, and avoid cotton. If the end supports are trees, a counterweight or pulley arrangement lets the wire move in wind without stressing the wire or the feedpoint. A fixed tie to a swaying tree will eventually break something. Center support and feedpoint. The center insulator carries the weight of the coax, so use strain relief. Let the coax leave the feedpoint and run away at right angles for a while, or drop it straight down from the junction, and do not let it lie parallel to a dipole leg. Seal the connection or the coax end against water, because water wicking into braid is a common reason for a dipole that worked at first and later did not. Baluns and chokes. A coax-fed dipole is a balanced antenna on an unbalanced line. If nothing stops common-mode current, the outside of the coax becomes part of the antenna. The symptoms are RF in the shack, SWR that changes when you move the cable, and a distorted pattern. A 1:1 current balun or a choke at the feedpoint helps. For HF, a coax choke is often wound from several turns of coax on a type 31 ferrite core, or as a stack of cores. The material and number of turns determine the usable band, so check the choke's impedance on the bands you care about rather than assuming. A single-band air-coil choke made from the coax itself can also work if its self-resonance falls in the right place. Ladder line. Open-wire or window line has low loss even at high SWR, which is why it is common for multiband doublets. Keep the line balanced: avoid running it close and parallel to metal, gutters, or a mast, and twist it or space it away at the points where it must pass near them. At the shack end you need a tuner with a balanced output, or a 4:1 or 1:1 balun, and the balun itself will have limits on how much reactance it can handle. Some designs are intended as a resonant multiband system, such as a fan dipole or G5RV-style system. A non-resonant doublet with a tuner will work on many bands, but the pattern changes with the band, and on some bands the feedline is a significant part of the radiator. Verticals and radials. A quarter-wave vertical over a good ground has a feedpoint resistance around 36 ohms. Elevated radials that droop downward at about 45 degrees raise that toward 50 ohms. A common starting point for a raised vertical is a few resonant radials, with more helping. For a ground-mounted vertical, radial count matters much more, and a larger number of shorter radials is a frequent compromise. A 33 ft telescoping fiberglass pole is a convenient mast for 40 m with a wire taped along it. Check the pole's top-section limits and guy it if it is tall, since a pole near its limit will bow, and a bowed wire is not the shape you modeled. Traps versus simpler multiband designs. A trap is a parallel LC circuit that isolates the outer part of the antenna on the trap's frequency. It shortens the physical antenna, but it adds loss, narrows bandwidth, and brings in tolerance, weather, and tuning problems. A fan dipole or a set of paralleled dipoles is simpler and more forgiving, although the elements can interact and need a little trimming. For a first project I would tend to try wires before building traps. Where do you draw that line? Measuring SWR. Measure at the feedpoint if you can, or remember that coax loss makes the reading look better than it is. An analyzer or NanoVNA that shows R and X is much more informative than SWR alone. A low SWR at a frequency does not guarantee the antenna is resonant there, and a reading can mislead if there is common-mode current on the coax. If the reading changes when you touch or move the cable, add a choke and measure again. Calibrate at the point where you connect, and check against a known 50 ohm load first. Modeling in EZNEC and MMANA. EZNEC uses a NEC-based engine and MMANA-GAL uses a MININEC-style one. Both are good for seeing how height, wire length, and ground type affect pattern and feedpoint impedance. Keep segment lengths sensible, set a realistic ground, and use a wire loss setting that matches your conductor. Run an average gain test in NEC-based programs when you are checking a model, since a poor model often shows up there. A model usually will not include your feedline's common-mode behavior or nearby clutter unless you add them, so expect small differences from reality. The most useful habit is to compare the model against measured data on the same antenna and note the difference, rather than trusting either one on its own. What would you want a beginner to settle before cutting the first piece of wire?
  2. I'm planning to get my Technician license and want to make sure I have the process straight before I book anything. Here's my understanding, so correct me where I'm off: 1. Study the Technician question pool (Element 2). 2. Get an FCC Registration Number (FRN). 3. Find an exam session run by Volunteer Examiners (VEs) and pay whatever fee they charge. 4. Pass the test, then wait for the FCC to issue a call sign that shows up in the ULS. Where I'm fuzzy: - What is the FRN, and do I need it before test day? - What's the best way to find a session, in person or online? - Which study resources are worth using: the ARRL license manual, HamStudy, or free practice exam sites? - Roughly what do exams cost, and what should I bring? - Once I pass, what should I do first besides buy a handheld? Any tips on how to approach the test itself would be appreciated too.
  3. Once you chase more than one award at a time, the rules start to blur. DXCC, WAS, WAC, WAZ, WPX, IOTA, the CQ DX Marathon, POTA and SOTA all want something slightly different. Some accept LoTW, some lean on paper QSLs or checkpoints, and some only need a log upload. I'd like to compare notes on how people keep it organized without losing credits. Here are the areas where I see people get tripped up most. DXCC basics: the basic award is built on current entities, but deleted entities have their own list and their own rules. Confirmed deleted entities can count toward your total, yet they do not count toward the Honor Roll, which is measured against the current list. Challenge is a different tally again, counting band-entity credits across bands. If your spreadsheet only has a single "worked/confirmed" column per entity, it won't answer those questions. LoTW matching: credit depends on both stations uploading signed logs and the QSO details matching closely enough. The usual causes of a missing match are a wrong or portable callsign, a mode mismatch, a time or date error, or a band error. Operators who log under a special-event call or from a different DXCC entity also run into trouble when the location in their LoTW station profile does not match where they actually operated. Other programs: WAS and WAC are comparatively simple. WAZ and WPX come from CQ, so confirm the current CQ rules before you assume LoTW is enough for a specific endorsement. IOTA uses its own group references and checking process. The CQ DX Marathon resets every calendar year, so it rewards a different kind of logging than lifetime awards do. POTA and SOTA are activity-based and depend on valid activations and chaser or hunter logs rather than traditional QSL cards. My questions for everyone: What do you use as the master record of what is confirmed versus merely worked? How do you handle a QSO that is confirmed for one award but unmatched in LoTW? And how do you flag deleted-entity contacts so they don't muddy your Honor Roll count?
  4. I want to get a Technician license and I'm trying to work out the order of operations before I commit to anything. Here is what I know and what I'm confused about. First, the test itself. I understand it's run by volunteer examiners (VEs), not the FCC directly, but I don't know how to find a session or what to expect when I show up. Do I need to register ahead of time? What do I bring? What does it cost? Second, the paperwork. I keep seeing FRN, ULS and CORES mentioned and I can't tell which one I need and when. Do I get the FRN before the exam or after? Third, studying. HamStudy and the ARRL Ham Radio License Manual both come up constantly. Do I need both, or is one enough? And how many practice exams should I be passing before I schedule the real thing? Last, once I pass, what are sensible first steps? I'd rather not buy a radio blindly. Any advice on the order of things is welcome.
  5. This thread is for comparing what moonbounce asks of a station on each band, and where the hard limits are. Some figures below are rounded, and individual stations vary a lot, so correct anything that looks off. Path loss is the starting point. Round-trip loss to the Moon is roughly 252 dB on 144 MHz, 261 dB on 432, 271 dB on 1296 and close to 289 dB on 10 GHz. The Moon's distance also changes. Perigee to apogee is about a 2 dB swing in round-trip loss, so the same station sounds noticeably better near perigee. Your own echo returns about 2.5 seconds after you transmit, which is a quick check on whether the station is working at all. 2 m: This is the most forgiving band for receive noise, because galactic noise limits you, but it is the hardest for polarization. A typical serious array is four or more long-boom Yagis phased together, often with a legal-limit or near-legal amplifier. Feedline loss matters more than people expect, since every 0.1 dB lost in the line is lost on both transmit and receive. A mast-mounted preamp with relays that stay low-loss helps, but sequencing the relay and preamp protection correctly is non-negotiable. Smaller stations can sometimes complete with large ones using JT65 or Q65, but they usually cannot hear their own echoes, so they depend on the big station's ears. 70 cm: Gain is easier per square metre of antenna, but you need more of it. Arrays of several Yagis are common. Sky temperature starts to matter, and low-noise preamps and short, low-loss lines pay off. Faraday rotation is still present but slower and less severe than on 2 m. 23 cm: Dishes become attractive. A dish of about 3 m with a good feed and a modest amplifier is a common entry point, and beamwidth is still around 5 degrees (roughly 70 × wavelength / diameter), so tracking is not demanding. Faraday rotation is small enough that most stations use circular polarization. Reflection reverses circular sense, so agree the convention with your partner and expect your own echoes to come back in the opposite sense from what you send. 10 GHz and up: The same 3 m dish now has a beam well under a degree, close to the Moon's own 0.5 degree diameter, so pointing accuracy, backlash and sun-tracking checks all matter. Doppler shift is in the tens of kHz and libration spread is much wider, so frequency stability, ideally a GPS-disciplined reference, is essential. Wide-tone digital submodes exist for these conditions. Modes: JT65 has long been the weak-signal workhorse, with submodes (A, B, C) chosen by Doppler spread. Q65 in WSJT-X is the newer option, with 60-second periods and tone-spacing submodes that suit the wider spread at higher bands. The usual guidance is the narrowest submode on 2 m, wider ones on 70 cm and 23 cm, and the widest on microwaves, but check the current WSJT-X documentation and local practice before a sked. For discussion: where do you think the best marginal gain is for a station moving up a band, more gain, lower noise, or better tracking? And which polarization approach is the most practical for a fixed-feed 2 m array?
  6. Contest season can look like a wall of acronyms to anyone getting started, and even experienced operators mix up exchanges when they switch between events. This thread is a place to compare the major contests and operating events and share planning tips. Please check the sponsor's current rules before every event. Dates, categories, bands, deadlines and exchange details change from year to year, and nothing here replaces the official rules. Finding dates. The WA7BNM Contest Calendar and the ARRL contest calendar are the usual places to look. Most major contests follow a pattern, such as the last full weekend of a month or the second full weekend, but the actual dates move each year. Put the real dates in your station calendar and note the start and end times in UTC, because that is how the rules are written. Typical exchanges. These are general patterns, so confirm the details in the current rules. CQ WW (SSB, CW and RTTY, held in different months): signal report plus your CQ zone. The scoring rewards zone and country multipliers.CQ WPX: signal report plus a serial number. The multiplier is each new prefix, which makes it friendly to casual operators.ARRL International DX (CW and phone, separate weekends): W/VE stations work DX stations. W/VE stations typically send a report and their state or province, and DX stations send a report and power.ARRL Sweepstakes (CW and phone, separate weekends): the most involved exchange. It has a serial number, a precedence letter, a check (the last two digits of the year first licensed) and your ARRL section. Careful copying matters, and many people practice it before the event.IARU HF World Championship: signal report plus ITU zone. Headquarters stations send an abbreviation for their society instead.ARRL 10 Meter: a single-band contest that depends heavily on propagation. It is worth reading the exchange rules for your location, because W/VE and DX stations send different information.ARRL RTTY Roundup: a digital contest with a report plus a state, province or serial number, depending on location.State QSO parties: usually a report plus a county for in-state stations, and a state, province or country for everyone else. County abbreviations vary by party, so look at the sponsor's list.VHF contests: usually a four-character grid square, with multipliers for each new grid. These events reward patience, antenna height and watching for band openings.Field Day, Winter Field Day and SOTA. These are not run the same way as the standard contests. ARRL Field Day is an emergency-preparedness exercise with a class and section exchange, for example a transmitter count plus a category letter. Winter Field Day follows the same general idea in colder weather with its own rules and categories, run by the Winter Field Day Association. SOTA (Summits on the Air) is an awards program rather than a contest. Activators operate from registered summits, chasers contact them, and the logs go into the SOTA database. Each summit has a reference code that you send or log. An activator generally needs a minimum number of contacts to qualify for activation points, so check the current rules. Log submission. Most contests ask for a Cabrillo file. Before you upload anything, check the callsign, category (operator, power, band, mode), operator name and address, and the claimed score header. Check the deadline, because late logs may not be accepted or may be marked differently. Many sponsors use a web upload form. Some still take email. Keep the original file, and watch for the confirmation message or log-checking report. A tool like 3830scores is optional and unofficial, but many operators post claimed scores there. Question for the thread: which events are on your calendar this year, and how are you choosing between full-time entry and casual operating? Please also share logging software setups and tips for avoiding exchange mistakes.
  7. On the transmitter side, I'd treat the low-pass filter and the keying circuit as part of the design from the start rather than as accessories. A typical low-pass filter for a few-watt HF stage is a 5- or 7-element Chebyshev or elliptic design wound on iron-powder toroids such as T37-2 or T50-2, with capacitors chosen as closely to value as you can manage. It is worth measuring the filter by itself with a nanoVNA or a signal source and a detector before it goes on the transmitter. Toroid turn counts and stray capacitance can shift the cutoff noticeably from what the calculator said. For checking output without a lab analyzer, a dummy load followed by a well-rated attenuator into an SDR input is a reasonable approach. The attenuator is critical: it protects the SDR front end and keeps it out of overload, which would give you misleading spurs. Look at the fundamental and at the second and third harmonics. Rough numbers are fine to begin with, but if the harmonics look strong, fix the filter or the stage's operating point before going on air. For key clicks, the standard fix is to shape the keying waveform with an RC network or a small transistor stage so the envelope rises and falls over a few milliseconds. Listen on a separate receiver tuned a few kHz away. If you hear thumps or clicks there, the edges are probably too sharp. Don't forget that keying an early stage (oscillator or buffer) can also cause chirp, so many designs key a later stage and leave the oscillator running.
  8. CQ WW, ARRL Field Day and SOTA all reward being on the air, but they reward different habits. Planning around all three can be a good way to build skills, as long as you treat them as separate games. CQ World Wide DX Contest. This is a worldwide DX contest with separate SSB and CW weekends, traditionally in the autumn. The exchange is a signal report plus your CQ zone, and multipliers come from zones and countries. Single-operator entrants choose from categories such as all-band, single-band, low power, QRP and assisted. Success here depends on band choice, a good run frequency, and knowing when to hunt multipliers instead of holding a frequency. Spotting networks, the Reverse Beacon Network and a logger such as N1MM+ or Win-Test matter a lot. ARRL Field Day. Field Day is a 24-hour emergency-preparedness exercise, traditionally held in June. It is less about winning than about getting a station running away from home power and logging as many contacts as you can. The class (for example 1A or 3A) tells people how many transmitters are operating and the type of site. Bonus points for things like emergency power, public information and satellite contacts can matter as much as raw QSOs. The setup is the real exercise: antennas, power, logging, shifts and a plan for when something fails. Summits on the Air. SOTA is a continuous program rather than a single weekend. Activators operate from designated summits, and chasers work them from anywhere. The usual goal is enough contacts to qualify the summit, but check the current association rules for the exact requirements and for details like the activation zone. Spots on SOTAwatch help chasers find you, and you need a plan for weather, weight, antenna and battery. Upcoming events. Dates, rules and exchanges change between years, so confirm anything with the official CQ, ARRL and SOTA pages before committing. A good habit is to read the rules a few weeks ahead, test your logger's contest template, and run a short practice session. For a mixed calendar, I'd be curious how people prioritize. Do you treat Field Day as a training exercise for the group, CQ WW as a serious score effort, and SOTA as a solo activity? Or do you use one setup for all three? Share your approach to antennas, logging, spotting and power, especially if you've had to compromise between portability and performance.
  9. Adding a few collinear and mobile mounting notes. For a base collinear, the mast matters. If you mount it beside the mast, the metal distorts the pattern, so the usual guidance is to put the antenna at the top of the mast, or use a standoff that holds it well clear of the mast, ideally at least a half wavelength. On 2 m that is on the order of a meter. A fiberglass section above a metal mast helps too. Most collinear designs also depend on a decoupling section or radials at the base to keep current off the feedline, so don't skip that part of the assembly. For vehicles, an NMO mount drilled in the middle of the roof is the standard answer for a reason. It gives a solid ground connection, and it keeps the coax routing neat. If you can't drill, a magnetic mount on a steel roof works, though you should clean the surface and the base regularly, since grit can scratch paint and dirt can affect the contact. Route the cable so it isn't pinched in a door seal, and use flat-profile cable only where it's designed for that. Finally, trim or tune mobile antennas for the band you actually use, and re-check the SWR with the vehicle in the position you normally operate from, since nearby metal and roof racks can shift the match. One safety point for fixed installs: keep masts and guy wires well away from power lines, and plan the grounding of the mast and coax shield before the first storm season, not after.
  10. Your numbers are in the right range. I'll take the questions in order. Minimum station. There is no sharp line, because what matters is the combination of your station and the station at the other end. For 144 MHz, a common starting point is an array of several long-boom yagis, often four, with a few hundred watts to the legal limit at the antenna. A single yagi will not hear its own echoes, and you will mostly depend on very large stations to copy you. Some people do start that way, but expect a short list of possible partners and plenty of failed attempts. Moon elevation matters too, so you need an antenna system that can point up and not only along the horizon. That means an azimuth/elevation rotator setup, or a fixed array with limited elevation range. Pointing accuracy also matters more as the beamwidth narrows. Preamp versus power. Receive performance usually gives the cheaper improvement. Put a low-noise preamp right at the antenna, with a sequencer so you never transmit into it. Every dB of feedline loss between the antenna and the preamp counts directly against you, both on receive and as wasted transmit power. Use low-loss cable, keep runs short, and use quality connectors. If you can't hear weak echoes, more watts won't help you work stations. Measure your system noise by comparing cold sky and ground or warm-object noise (sun noise and Moon noise measurements are also standard on higher bands). Modes. CW is still used by large stations, and it is the traditional choice when you can hear well enough. For most amateurs the practical option is digital weak-signal software from the WSJT family. JT65 was long the standard for 2 m and 70 cm EME. Q65 is now available in WSJT-X and is designed for weak-signal paths including EME. Check the current WSJT-X documentation for which submode (period length and tone spacing) is used on each band, because that depends on frequency and fading. Timing is by one-minute-style T/R sequences, with one station transmitting first and the other second. Keep your computer clock synchronized, and a second or so of error is already too much. Doppler. The software can correct for it, which is why a rig that can be CAT-controlled is useful. You can also run a Doppler-tracking setup so the other station hears you on the nominal frequency. Learn how your software handles this before your first schedule.
  11. Most operating problems on the air aren't technical. They come from small habits: stepping on someone, rambling during a check-in, or not knowing who is in charge of a frequency. Here is a rough list of practices that tend to make nets and everyday contacts easier for everyone. Please add, disagree or refine, since local customs vary. Listen first, then ask. Before you transmit on a simulplex, HF or repeater frequency, listen long enough to know whether it is in use. On HF, ask "Is this frequency in use?" and give your call sign. If someone answers, move on. Weak stations can be hidden from you by propagation, so one clear listen is not proof the channel is free. QRL? is the Q-signal version of the question. Identify properly. Use your call sign clearly and at the intervals your licence requires. In the US that means at the end of a communication and at least every 10 minutes during one, but check the rules where you operate. Use standard ITU phonetics, especially in poor conditions. Inventing phonetics is fine on a casual local repeater, but it can cause errors when the signal is marginal. Net basics. A directed net has a net control station (NCS) who decides the order of traffic. Wait for the NCS to call for check-ins, give only your call sign (and name or location if the net asks for it), and then stay quiet until called. If you have traffic, say so briefly. Don't start a side conversation on the net frequency. If you must leave early, tell the NCS when you check in or at the next opportunity, and don't wait for a long pause. Priority traffic. Emergency or priority traffic always takes precedence over routine chatter. If you have it, say so plainly and in the format the local net or repeater owner expects. Don't use urgent-sounding words as a way to jump the queue on an ordinary net. What do you think is the single most useful habit for newer operators?
  12. I'd like to sort out a few terms that tend to get mixed up in remote operating discussions, because the design decisions differ a lot depending on which one you mean. First, remote station control: you operate your own or a hosted station from somewhere else. The radio, antenna and amplifier stay put, and you control frequency, mode, filters, PTT and sometimes antenna switching over the network. Services in the RemoteHams vein sit in this space. They provide client software and a way to reach stations. Check the service's own documentation for exactly what it supports, since features and rules for hosts and guests vary. Second, SDR remote operation: here the question is whether you stream demodulated audio or the underlying IQ or spectrum data. Streaming audio plus CAT control is light on bandwidth and tolerant of a mediocre connection. Streaming a panadapter or wideband IQ gives you the waterfall and the ability to pick signals off the band yourself, but it needs more bandwidth and benefits from stable, low-jitter links. For CW and digital modes, jitter often hurts more than raw latency. Third, internet linking: connecting repeaters, nodes or reflectors (EchoLink, AllStar, and similar systems) so that traffic from one RF system appears on another. That's a different job from remote operation. You're moving a shared conversation between systems, not handing one operator a seat at one station. Here are the points I think matter most when planning any of these: Safety on the transmit side. If the link drops while the transmitter is keyed, what happens? A hardware timeout timer or watchdog at the station should unkey the rig independently of the network software.Network exposure. Forwarding raw ports for a rig-control protocol to the open internet is risky. A VPN, an outbound-connection model, or an authenticated gateway is generally safer than leaving CAT or a web UI exposed.Audio path. Codec choice, sample rate and buffering affect both intelligibility and delay. Aggressive compression can mangle digital-mode tones, so it's worth testing the mode you actually plan to run.Control operator and licensing. Rules on remote control, control points and who is responsible for the transmission differ by country and license class. Read your regulator's rules and any host rules before operating a station remotely.Receive-only versus transmit. Many people begin with remote receive to evaluate noise floor, antennas and the audio chain. That's a lower-risk way to validate the setup before adding PTT.For people running or planning a remote setup: what does your split look like? Is the SDR front end at the remote site, with only a thin client at home, or do you keep a conventional transceiver and add a control layer? And where do you draw the line between a remote base and a linked node?
  13. For a first activation I'd lean toward 40 m CW or SSB, or 2 m FM if there's a local chaser community. Forty metres gives you reasonable daytime coverage for regional contacts, and lots of activators use it, so chasers tend to look there. If you're newer to CW, 2 m FM is a lower-stress way to bank your four contacts. Just check your local band plan and any calling frequency conventions before you go, because they differ by country. On spotting: get a spot out as soon as you have the antenna up and a frequency that's clear. Listen for a bit first, because it's easy to land on top of another QSO. Then call CQ SOTA or announce the reference. Once you've got the first few contacts, it's worth re-spotting if you change band or mode, since chasers rely on current spots. One kit tip is to bring spare coax or a spare connector adapter. Small adapter failures are annoying when you're a long way up the trail.
  14. On the chasing side, a few habits make things easier for the activator. Listen for the full callsign before you call. Many people hear a partial call and send theirs over the top, and that wastes the activator's time on a cold summit. Once you've been acknowledged, give your callsign clearly, using phonetics if conditions are poor, and then stay out of the way. If you're on CW, don't send much more than your call unless the activator asks for it, and match their speed where you can. If you're on SSB and the activator is working a pileup, short calls usually do better than long ones. Pay attention to whether they are working split or taking calls on the same frequency, since an activator in a pileup will often say so. If you're also on a summit yourself, a summit-to-summit contact is worth looking for. Those are often prized by activators, and they tend to get priority when the activator hears you, so state that you're on a summit and give your reference. Check your association's current rules for how those contacts are logged and scored, since details can differ between programmes and change over time.
  15. For receiving, mixing short, frequent practice with real signals seems to work better than long sessions of one kind. Machine-generated code is useful because the timing is perfect, but real signals teach you to deal with fading, QRN, drifting stations and variable fists. A common progression is to learn characters at a fairly high speed with extra space between them, then move to on-air listening to routine exchanges such as CQ calls, signal reports and 73. These are predictable, so you can build confidence even when you miss a character. Contest-style exchanges are also a good training ground for receiving because the format is repetitive: callsign, report, serial number or section. If you miss part of a callsign, ask for just the part you need, such as a repeat of the prefix or suffix with a question mark, instead of asking for the whole thing again. That saves time and keeps both operators in rhythm. Using standard abbreviations like AGN, PSE, and QRS also helps, but only use them if the other station is likely to understand them. If someone is struggling with your speed, slow down and keep your spacing clean.

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.