Skip to content
View in the app

A better way to browse. Learn more.

Ham Radio Base

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.
Ham Radio Base — Education, Resources, Projects and Community
☀ Solar
SFI 90
SN 33
A 3
K 1 Quiet
X-Ray B1.3
Wind 312.6 km/s
Aurora 2
Updated 11:00 UTC HamQSL · N0NBH
Day 80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night 80/40m Good 30/20m Good 17/15m Fair 12/10m Poor

Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database. Vanity callsign availability is refreshed daily at 6:00 AM CST. The vanity search may be unavailable for a few minutes during this update.
Live DX spots
Live DX Spots — 70cm via PSKReporter · scroll or pinch to zoom
Band
Mode
Time
Loading map data…
MHz DX Spotter Info
Recent spots —
Select a band above to load spots
Ready — select a band to fetch live spots

David Rodriguez

Members
  • Joined

  • Last visited

  1. Rare-entity pileups tend to go wrong in the same ways, so I'd like to collect practical technique in one place. Think of targets like Clipperton or Bouvet: uninhabited or hard-to-reach places, usually activated by a DXpedition with a limited operating window, and a lot of callers per QSO on every band. The first rule is to listen before you transmit. Work out whether the DX is operating simplex or split. If he says "up" or "listening up 5 to 10", he is transmitting on one frequency and picking callers on another. Put the DX on VFO A and set VFO B (or your split function) to the listening frequency. Check your rig's TX indicator, because most self-inflicted QRM comes from someone who thinks they are split and isn't. Calling on the DX's own transmit frequency is the quickest way to become the person everyone is annoyed at. Next, watch where the operator is actually picking. A DXpedition operator might announce "up 1 to 5" and then spend ten minutes between 3 and 4 kHz up. Follow the pattern. Is he going down the pileup, taking whatever is strongest, or working by call area or continent? If he calls "Europe only" or "North America", stay quiet unless you are in that group. If you are not being heard, tuning a little off the crowd's centre sometimes helps, but don't move so far that you are calling on top of someone else's QSO. Timing matters more than power. A common approach is to call just as the DX finishes a QSO, so your call lands when he starts listening again, not during his transmission. Tailending means jumping in on the end of a QSO. Done carefully it can work, but done carelessly it just adds QRM. Many operators suggest sending your call once or twice, then listening, instead of calling continuously. A DX who hears a partial call will send a fragment such as "JA3?" or "K1...", and that is your cue to send your full call right away. Don't send it when a different station was just asked for. Callsign technique counts too. On CW, send your call cleanly at a speed the DX is already using or a little slower. On SSB, use standard ITU phonetics, not inventive ones, because the DX operator is decoding under noise and across accents. If you are asked for a partial, answer only that. Don't add your name, signal report, or anything extra. Which parts of this give you the most trouble: judging the split, getting your timing right, or hearing the DX at all? And for those with experience on both sides of the mic, what do you wish callers did differently?
  2. I'm sketching a build order for a small CW/SSB QRP station and would like opinions on the sequence. The tempting plan is to jump straight to a transceiver (a BITX-style board, a uBITX, or a Pixie-class toy) and sort out the accessories later. But a transmitter without a known load, a filter and a way to measure power is mostly a way to make unknown RF. This is the order I'm leaning toward: 1. Power supply and bench basics. A fused 12-13.8 V supply with a reverse-polarity diode, a current-limited bench source if possible, and ferrite or LC decoupling on the radio's supply input. Cheap switching supplies can put noise all over HF, which a sensitive direct conversion receiver will show you immediately. 2. Dummy load and RF probe. Several 2 W metal-film or carbon-film resistors in parallel make a perfectly good QRP load. Four 200 ohm resistors in parallel give 50 ohms at 1 W each for a 4 W total rating, with a fair margin at 1-5 W if you keep the keying duty cycle reasonable. A diode RF probe for the DMM gives a rough voltage reading. Peak voltage across 50 ohms converts to power with P = Vpeak² / (2 × 50), after correcting for diode drop. 3. Low-pass filter for the band I'll use. A 5-element Chebyshev or Butterworth low-pass built on powdered-iron toroids (T37-2 or T50-2 are common for QRP) is the usual choice. The value of this stage is that you can check it with a NanoVNA before it ever sees a transmitter. 4. SWR bridge. Either a tandem-match style directional coupler or a resistive return-loss bridge. The bridge is good for tuning antennas at low power, while the coupler can stay in line during operation. 5. Receiver, then transmitter, then keyer. A direct conversion receiver teaches a lot cheaply, and a keyer is a small digital project that can come last. Where would you reorder this? And what would you buy first as test equipment: a NanoVNA, a used oscilloscope, a frequency counter, or something else?
  3. Most active operators end up with a mix of confirmation methods, and it's not always obvious which ones are worth the effort. I'd like to hear how people here decide what to use for which contact. Here's the basic landscape as I understand it, so corrections are welcome. Logbook of The World (LoTW) is run by the ARRL. You install TQSL, request a callsign certificate, and sign your ADIF log data before uploading. A confirmation only happens when the other station has also uploaded, and the two records match on callsign, band, mode and a time window (roughly 30 minutes). Your TQSL station location also has to match what you actually operated from, including the DXCC entity and, where relevant, grid square and zones. A wrong station location is a classic cause of 'why don't my QSOs match?'. LoTW confirmations count toward ARRL awards such as DXCC and WAS. eQSL is a separate system with its own database and electronic card images. It's easy to use and many operators upload there, but eQSL confirmations are not accepted for DXCC. Its Authenticity Guaranteed status is also a distinction within eQSL, not a substitute for LoTW. If you chase awards, check each sponsor's rules before treating an eQSL as a confirmed contact. Then there are paper cards, which come in two flavors. The bureau route goes through your national society's outgoing and incoming QSL service. It costs little, but it can take many months or longer and works best for bulk exchanges. Direct cards go by mail with a self-addressed envelope and return postage, often with cash for a DX station, and they are the usual way to get a faster paper confirmation. Check the operator's QRZ.com page, website or Club Log notes for their preferred QSL route and any manager before sending anything. A few practical questions for the thread. Do you upload to LoTW after every session or in batches? Do you bother with eQSL at all? When do you send a direct card instead of waiting on LoTW? And for card design, what details do you consider essential? I'd put callsign, UTC date and time, band or frequency, mode, signal report and QSL route on the list.
  4. One thing that helps on directed nets is to write down what the NCS says before you key up. Keep a scrap of paper or a logging window open with the net frequency, the check-in style, and any announcements. If the NCS asks for "mobile stations only" and you're at home, you can wait for the next round instead of making them repeat the instruction. Another habit is to make your call sign unmistakable. Use standard phonetics, say it slowly once, and stop. If the NCS comes back with a partial call, repeat the full call once and then give them room. On a weak-signal night that's usually better than repeating it three times in a row. For nets that handle formal traffic, take care with message wording. Read it as written, don't add your own commentary, and confirm with the NCS or receiving station if they ask for a repeat. That's less about speed than about the message arriving intact.
  5. For a serious contest entry, the separation that holds up best is to treat N1MM+ as the log of record for the contest and Log4OM as the archive. Live-logging into both sounds convenient, but it creates two databases that can disagree about the same QSO. Typical differences are a corrected callsign in one program, a deleted dupe in the other, or a different band caused by a CAT hiccup. Merging them afterward is less work than reconciling them mid-contest. If the entry is a digital-mode contest, test the whole path before the start. Make a few test QSOs, or use a dummy contest database. Confirm that the callsign, band, mode, RST or exchange and UTC time all arrive correctly in N1MM+. Then export ADIF and Cabrillo and check that the output looks right. Also confirm what the sponsor accepts as a digital mode in that particular event. Some contests treat FT8 or FT4 as a distinct digital category, and others don't allow them at all.
  6. Adding to the grounding and safety side, since it often gets treated as one thing when it's really two or three. Mains safety earth, lightning protection and RF grounding have different jobs. A common approach is to bond the equipment in the shack together, tie it to a single entry point where the coax comes in, and connect that point to a proper ground system outside, with the electrical code of your country governing the mains side. Long ground wires that are great for DC can be poor RF grounds, because at HF a few metres of wire is a significant impedance. For lightning, the usual advice is to disconnect antennas when not in use and to use surge protection only as part of a properly designed system, not as a guarantee. If an amplifier is on the shopping list, check the keying line first. Many transceivers have limits on the voltage and current their amp-keying output can switch, and an older amp's relay line can exceed them. Also make sure the ALC connection or drive level is set so the amp isn't being overdriven, which makes splatter. On data modes, the amplifier and the transceiver both see near-100% duty cycle, so running well below maximum power is sensible. Many operators run digital modes at a fraction of rated output for exactly that reason. Finally, think about layout. Keep the RF cables and the computer's USB and audio cables from running parallel for long stretches, and give yourself room for a switch or relay box if you'll have more than one antenna. Those small decisions make adding gear later much less painful.
  7. I agree with checking supply rails early, and I'd add that you should check them in the right place. A radio can show a good voltage at the power jack while an internal switched rail is low because of a failed pass transistor or an overloaded line. If a rail is low, measure whether it recovers when you lift the load, for example by removing a suspect component or unplugging a module. If it jumps back to normal, you've narrowed the fault to that branch. For signal tracing I like the RF probe on a multimeter or a scope with a 10x probe, plus a generator set to a steady unmodulated carrier on a known frequency. The most useful habit is to change one thing at a time and write down what you see at each test point. Photographs of the board before you disturb anything help too, especially for shield cans and ribbon connectors.
  8. I'm putting together a checklist for a first Summits on the Air activation and want to compare notes on the parts that tend to go wrong. Not the hike itself, but the radio side: what you need to know before you leave and how you run the operation once you're on top. Here is the skeleton I'm working from. Please correct anything that's off. Summit reference. Every summit has a reference in the form association/region-number, for example W7W/KG-001 or G/LD-003. Check the reference against the current association summit list before you go, and read that association's own rules. Associations can add local restrictions on access, antennas, or operating, and the summit list gets updated. Activation zone. The general rule is that you operate within a set vertical distance of the summit high point (25 m, as I understand it). It's worth checking your map or GPS before setting up, particularly on flat or wooded summits where the true top isn't obvious. Qualifying. You need at least four contacts from the activation zone to count it as an activation. After that, additional QSOs are a bonus for chasers. I'd like to treat four as the minimum and not the target, but I also want a plan if conditions are bad. Band and mode. My thinking is a compact end-fed wire or a linked dipole on a pole, with 40 m and 20 m as the main bands. CW is more efficient for QRP power levels, but I'd like a fallback to SSB or FM on 2 m for local chasers. Spotting. I plan to self-spot through SOTAwatch or have someone spot me, then confirm the frequency before calling CQ SOTA. I'm trying to work out the best order: set up and test first, spot, then call, or spot early so chasers are waiting. Questions for the group: What's your preferred order of operations once you arrive and are cold, tired, and short of time?How do you decide which band to start on when you can't test propagation beforehand?How do you handle a pileup when you only have a paper log and cold fingers?Is it worth carrying a 2 m handheld as a backup for the four-contact minimum?
  9. I would push back slightly on always cutting the low end. It depends on the voice and the mic. A deeper voice through a mic with a lot of proximity boost can sound boomy and muddy, so a high-pass filter helps. But if you narrow the bandwidth and also cut lows aggressively, the result can sound thin and tinny, which hurts readability at the other end on a weak-signal path. A reasonable approach is to change one thing at a time and compare recordings. Try a transmit bandwidth around 2.4 kHz for crowded band conditions and wider, perhaps 2.7 to 3.0 kHz if your rig allows it, for casual ragchews on a quiet band, keeping in mind that wider is not courteous during contests or when the band is busy. Also be aware that some receivers' filters make your signal sound different than it does to you, so ask more than one station for a report.
  10. Some practical points on the exam itself, plus the steps around it. Readiness. Don't judge yourself by one lucky practice run. A common rule of thumb is to take full-length practice exams until you score comfortably above the passing mark several times in a row, not just barely over it. Then review every question you missed and make sure you know why the right answer is right. Distractor answers on these exams are often plausible-sounding, and understanding the concept is what lets you rule them out. Test-day habits. Read the entire question and all four answers before choosing. Some options are worded to catch skimmers.Answer the ones you know first, then return to the harder ones. Eliminate obviously wrong choices before guessing.Don't memorize answer letters. Versions of the exam can shuffle the order of the choices.Bring a pencil, a simple calculator if you want one, and valid photo ID. Confirm with the exam team beforehand what they permit, because policies vary by team.In the US you'll typically need an FCC Registration Number (FRN) before applying. Check the current process and any fees with the volunteer exam team or the FCC, as these change.Finding a session. Local clubs often run both classes and exam sessions. National organizations and volunteer examiner coordinators list sessions, and some teams offer remote exams. A club class can also give you someone to ask about gear. After passing. Wait until your call sign is actually issued and appears in the official database before you transmit. A passing score alone is not authorization. Once it does, a basic dual-band handheld and the local repeater directory are a normal first setup. Listen for a while before you call, so you pick up how local operators handle nets and identification.
  11. Lots of operators end up working toward DXCC, Worked All States and CQ Worked All Zones in parallel, since a single contact can count toward all three. But the awards don't count the same things, and confirmations don't always flow the same way. This thread is for comparing notes on how to organize the chase so you aren't redoing work. Quick framing of what each one tracks: DXCC counts entities, not countries. The ARRL list includes places like island groups and remote territories that have their own entity status. The basic award needs 100 confirmed current entities, and there are mode-specific versions (Mixed, CW, Phone, Digital) plus band endorsements.WAS is the 50 US states. Endorsements exist for mode and band, so a one-band WAS is a different project from an all-band collection.WAZ uses the 40 CQ zones, which are not the same as ITU zones. That trips people up. Big countries such as the US, Canada, Russia, Brazil and Australia span multiple CQ zones, so the entity alone doesn't tell you the zone.Some topics worth discussing: 1. Logging setup. Do you use a logger that tracks all three awards, or separate spreadsheets? Whatever you use, a clean log with correct callsigns, bands, modes and UTC times will save you headaches later. 2. Confirmation method. Logbook of The World is the usual path for convenience, but paper QSLs still matter for some DX stations and older contacts. Check each award sponsor's current rules on what is accepted, because they can differ and change. 3. Zone confusion. For WAZ, how do you verify the zone when working a station in a multi-zone country? Looking at a CQ zone map for the actual location is safer than assuming from the prefix. 4. Strategy. Do you chase the rare ones during DXpeditions and fill in the easy ones later, or focus on one award until it's done? Which approach has been more productive for you?
  12. Many builders new to homebrew radio go straight for a transceiver kit-from-scratch, but the order you build things in has a big effect on how much you learn and how much frustration you hit. Here is one possible build order to pick apart. 1. Accessories and test gear first. A dummy load, an RF probe for a multimeter, a simple SWR bridge, and a bench supply with a current limit (or at least a fuse and a series resistor for first power-up) are all quick builds. They also make every later project easier to debug. A low-pass filter for your chosen band belongs in this group too, since you will want it on every transmitter you build. 2. A receiver next. A direct-conversion receiver is a popular choice: an input bandpass filter, a diode-ring or active mixer such as an SA612/NE602-style part, a product detector fed by a VFO or Si5351, then an audio preamp, a low-pass audio filter and an LM386 or similar to drive headphones. You can hear what you are doing, and it teaches gain distribution, LO injection level, and filtering without any risk of putting a signal on the air. 3. A simple transmitter last. A crystal-controlled oscillator, buffer, and a one- or two-transistor power amplifier on a single band, followed by a proper harmonic filter, keyed with some shaping on the keying line. Low-power CW is the usual starting point because it keeps the circuit simple. Some points where opinions differ and which are worth discussing: Is it better to start with a superhet and avoid the quirks of direct conversion, or is the simplicity of direct conversion worth it? Should a first VFO be an LC oscillator, or is a synthesizer module the pragmatic choice even if it means dealing with square-wave harmonics? And how much measurement gear is really needed before the first transmitter goes on the air? A reminder that transmitting requires the appropriate amateur licence in most countries, and the output should go into a dummy load while you check frequency, power and harmonics. What order would you suggest, and what would you move up or down the list?
  13. Your split is the standard one, and I'd draw the line at consequences. If a missed deadline or a crash could hot-switch a relay, key an amplifier into the wrong antenna, or leave PTT stuck on, put that logic on a microcontroller with a hardware watchdog. The Pi sends commands such as "select antenna 3" or "request TX" over USB serial or I2C, and the microcontroller decides whether and when to act. A crashed or rebooting Pi then can't leave the station in a dangerous state. Sequencing is the clearest example. A proper T/R sequence is: switch coax relays, then enable the preamp bypass or amplifier, then allow RF. Releasing runs in reverse, with a small delay between steps. That's easy to get right in a microcontroller loop with timers, and it's unreliable under Linux scheduling. Add a TX timeout in firmware too, so a stuck PTT command from software drops out after a set time. On direct GPIO, I'd avoid it for anything beyond logic-level signals. Use a transistor or driver array such as a ULN2003 for relay coils, add flyback diodes if the driver doesn't include them, and consider opto-isolation or a separate relay supply so coil switching doesn't inject noise into the logic rail. Fit pull-down or pull-up resistors so the outputs are in a safe state during boot, when the pins are not yet configured.
  14. so ive been running a fairly old TS-570 for probably 8 years now and its been solid but im starting to feel like im missing out on some of the newer stuff. been eyeing the IC-7300 for a while and honestly the price has come down enough that its not completely insane anymore. my main thing is i do a mix of SSB ragchewing and some light digital, FT8 mostly, occasional PSK31 when i can find anyone still doing it. what i keep reading is the SDR-based architecture on the 7300 makes a real difference for crowded band conditions, which around here on 40m in the evenings is definitely a thing. but i dont know if thats just marketing talk or if its actually noticeable coming from a superhet like the 570. also curious how the built in waterfall holds up for actually finding signals vs just looking pretty. anyone made a similar jump from older gear to the 7300 or something comparable like the 7610 if you had the budget not in a huge rush just trying to figure out if its worth saving up a bit more or just grab the 7300 now
  15. yeah the inverting transponder thing takes a while to get wired into your brain honestly. what helped me was setting up the rig so i only chase doppler on the downlink and let the uplink sit. the idea being that the other station is doing the same, so you kind of find each other in the middle. it's not perfect but for a short LEO pass you dont really have time to be fussing with both VFOs at once anyway, especially if your rotator is eating your attention too. for the two radio thing — a lot of people do it. one radio dedicated to the downlink, one for uplink, and you mentally separate the doppler correction for each band. 70cm shifts a lot faster than 2m so the downlink on FO-29 needs more babysitting. there's doppler correction software like GPredict that can drive CAT-capable rigs automatically which is genuinely nice once you get it set up, though getting the CAT control talking to two radios is its own adventure depending on what you're running.

Affiliate Disclosure: As an Amazon Associate, Ham Radio Base earns from qualifying purchases. Some links throughout this website may be affiliate links. If you purchase a product through one of these links, we may earn a commission at no additional cost to you. Your support helps us continue creating free articles, tutorials, reviews, and resources for the amateur radio community. N0TLB © Ham Radio Base - Powered by the Ham CQ DX Community. All rights reserved.

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.