-
Remote station design: RS-BA1, SCU-LAN10, RigPi, SmartLink and where the real risks are (latency, security, licensing)
I'd like to compare approaches to remote station control and talk through the failure modes, not just which box is easiest to set up. The common options seem to fall into three groups. First, radios with native network support. The Icom IC-7610 has an Ethernet port and works with Icom's RS-BA1 remote software, which carries CAT control and audio. Yaesu's SCU-LAN10 is a network interface for supported Yaesu radios, so check the compatibility list for your exact model and firmware. FlexRadio's SmartSDR is a different design: the radio is already a network device, and SmartLink handles access over the internet. In each case the vendor defines the protocol, so your main jobs are network design and safety. Second, a controller in front of an ordinary radio. A RigPi-style Raspberry Pi controller, or a PC running Hamlib/rigctld, remote audio software and a remote switch, lets you connect almost any rig that has CAT and audio. It's flexible, but you own more of the integration: audio levels, PTT handling, antenna switching and what happens when something hangs. Third, services and receive-only networks. RemoteHams.com is oriented toward remote operation, with software and station sharing. Check the site for what is currently offered and how access is managed. WebSDR and KiwiSDR are different: they are receive-only, browser-accessible SDRs run by their owners. They are useful for checking propagation, for seeing whether your own signal is getting out (if you're not using a transmit-capable remote), and for monitoring a band from another place. They are not a remote base, and you have no control over them or their availability. On latency, bandwidth matters less than jitter and consistency. SSB over a typical Opus-style audio stream is workable with round trips in the tens to low hundreds of milliseconds. The pain shows up in QSK CW, in break-in and in fast-turnaround modes. For CW, a keyer at the station (for example a WinKeyer-type device or a keying path that sends timing to the remote end) avoids shaping elements across a jittery link. For FT8 and FT4, put the decoding software on the station side or ensure the clock is well disciplined on whichever PC runs it, because decode timing depends on accurate time, not on low latency. On security, don't just forward the radio's control port to the internet. A safer baseline is a VPN into the home network (WireGuard or similar), the radio and controller on a separate VLAN or at least a separate subnet, strong unique credentials, updated firmware, and no default passwords on the controller. Where a vendor offers a relay or authentication service such as SmartLink, understand what it exposes and keep your account secure. Safety matters as much as security. Think about what happens if the link drops mid-transmission: a hardware or firmware TX timeout, a way to drop PTT, a remote power switch for the amplifier and the radio, an out-of-band way to reach the site (a second ISP or a cellular fallback), and some way to confirm antenna and tuner state before transmitting. A stuck carrier into the wrong antenna is a worse problem than a failed login. On the rules, remote operation is allowed in many places, but details differ by country. In general, the operator needs a licence and privileges valid where the transmitter is located, the control operator must be able to cease transmission, and unattended or automatic operation has its own conditions. Contest and award sponsors have their own remote rules, such as limits on station location and on where receivers and transmitters can be. Read the current rules for each, and check your national regulator for the exact wording. Questions for the thread: what are you using to handle PTT failsafe, and how much do you trust the vendor link versus your own VPN? Where do you draw the line for remote operation with no one on site?
-
First power-up of a homebrew QRP rig: what to check before the antenna goes on
Most dead kits and homebrew rigs fail in dull ways: a solder bridge, a backwards electrolytic, a toroid with the wrong turns count, or a missing ground. Whether it's a Pixie, a Tuna Tin 2 style crystal-controlled transmitter, a BITX-type SSB board or a uBITX, a fixed bring-up order saves a lot of time. This is a suggested sequence, and I'd like to hear where others would change it. 1. Cold checks. With the power off, check the supply rails to ground with a multimeter for a dead short. Look at the board under magnification for solder bridges, especially on fine-pitch headers and around the Si5351 or Arduino-style modules. Verify the polarity of electrolytics, diodes, and any transistor whose pinout differs from the one in your head. A series diode or a fuse on the supply input is cheap insurance against a reversed connector. 2. Current-limited first power. A bench supply with the current limit set just above the expected idle draw is ideal. If you don't have one, a small series resistor or a 12 V lamp in series with the supply will show a fault as a lit bulb instead of smoke. A Pixie-style rig should idle at a few milliamps. A transceiver with a display and microcontroller will draw far more, so read the build notes for the real figure instead of guessing. 3. Receiver before transmitter. Confirm audio first. A direct conversion receiver should produce a steady hiss and respond to a finger on the antenna input, with some hum or noise pickup. Then check that the local oscillator is actually running. A scope on the LO output is best. Otherwise, listen for the LO on a second receiver, with the antenna disconnected. Remember that a direct conversion receiver can radiate LO leakage and is prone to AM broadcast breakthrough and microphonics, so don't judge it only by whether signals come in. 4. Transmitter into a dummy load only. Use a proper 50 ohm load, not a random resistor on long leads. Power into a load is P = Vrms² / R. For 50 ohms, 1 W is about 7.1 V RMS (20 V peak to peak), and 5 W is about 15.8 V RMS (45 V peak to peak). A scope and a probe on the load will tell you roughly what you are making. Use an RF probe or detector if your scope bandwidth is marginal for the band. 5. Look at the spectrum, not just the waveform. A waveform that looks like a decent sine wave can still hide harmonics that are only 20 to 30 dB down. If you have an SDR, a spectrum analyzer or a second receiver, check the second and third harmonics, and check that your low-pass filter is the right one for the band in use. Class C and class E style stages in particular need a good filter. With multiband designs, a filter that is right for one band and wrong for another is a common problem, so check every band you plan to use. 6. Then the SWR bridge. A simple bridge or tandem match is most useful when calibrated with a known 50 ohm load for a null on reflected, then a short and an open for a full reflection reading. At QRP power, diode forward voltage drop makes the readings nonlinear, so treat an uncalibrated meter as a relative indicator rather than a precise measurement. What would you move or add? In particular, how do you handle the very first transmit test when the only test gear is a multimeter and a dummy load?
-
Starting EME: what really limits 2 m, 70 cm, 23 cm and 10 GHz moonbounce stations?
I want to compare what each band demands for a first EME station: arrays versus dishes, preamp placement, polarization, and how much tracking accuracy you need. I'll start with a framework, and please correct anything that's off. The round-trip path loss is very large on every band. A commonly quoted figure is roughly 250 dB at 144 MHz, rising about 9.5 dB each time frequency triples (about 261 dB at 432 MHz and about 271 dB at 1296 MHz). Antenna gain also rises with frequency for a given physical size, which is why a 3 m dish is a small antenna on 2 m but a serious one on 23 cm. Moon distance matters too. Between perigee and apogee the path loss changes by a couple of dB, so a marginal sked usually works better near perigee. Each band has a different main problem: On 2 m, the difficulties are sky noise, Faraday rotation and the size of the array. Galactic background noise is high, so the moon's position against the sky matters a lot. Polarization fading from the ionosphere is strongest here. On 70 cm, Faraday rotation is much slower, since it scales roughly with 1/f². Array size and feed-line loss become more important. On 23 cm, Faraday rotation is generally negligible. The main work is a decent dish, a low-loss feed system, and pointing within a fraction of the beamwidth. A 3 m dish at 1296 MHz has a beamwidth of roughly 5 degrees, using the rule of thumb 70λ/D. On 10 GHz and other microwave bands, the beam is under a degree for a few-metre dish, so pointing and mechanical stiffness dominate. Libration spreading is also much larger, which reduces the peak signal in narrowband modes. On software, JT65 has been the traditional EME mode, with the B, C and higher sub-modes chosen to suit the band's Doppler spread. Q65 is now an alternative, with sub-modes designed for different spreads and the ability to average over several periods. WSJT-X's Astronomical Data window shows azimuth, elevation, Doppler, spread, sky-noise degradation and polarization offset, which helps with both planning and operating. My questions for the group: 1) Is a small 2 m array of a few long Yagis a realistic start, or should a newcomer go straight to 23 cm with a dish? 2) How much does a mast-mounted preamp with a low-loss relay change things compared with a shack-end preamp? 3) How do you plan skeds around moon declination, sky temperature and mutual window time? 4) What is the minimum I need to be able to hear my own echoes, and is that even a sensible test on every band?
-
Building a simple field kit for POTA and SOTA: what stays in the bag and what gets left home?
Don't forget the non-radio items, since they decide whether the day goes well. For a summit that's water, layers, a headlamp, a map or offline GPS track, and a plan for a turnaround time. The weather and daylight matter more than a QSO count. If thunderstorms are possible, skip the activation or leave early. A tall antenna pole is a lightning risk and not worth the points. At a park, think about people. Keep antennas and radials clear of paths and picnic areas so no one trips on them, and flag any guy lines. If you're near others, a quiet speaker or headphones helps, and a generator is usually a bad idea. A clear sign or a quick friendly explanation answers most curious visitors and sometimes gets you a new ham. On logging, record the callsign, time in UTC, band, mode and RST as you go, and write down the park or summit reference at the top of the page. Even if you normally use software, a pencil and a small notebook are the best backup when a screen dies or the battery drops. For spotting, if you know you'll be out of coverage, ask whether a friend can post one for you, and work out in advance how to announce the frequency clearly. Then listen before you call CQ, so you don't step on someone else's frequency, and pick a spot with a clear space around it.
-
Planning your hamfest season: finding events, swap meet tactics, and getting more out of your local club
I wanted to start a general thread about hamfests, swap meets and club meetups, since they tend to get mentioned in passing and rarely get talked through properly. No specific dates here. Hamfest details change, so confirm anything with the organizing club's own page or a current listing before you plan a trip. Flyers and old forum posts go stale quickly. For finding events, the ARRL hamfest and convention calendar is a common starting point. Also check your section or state ham association page, and the websites or social pages of nearby clubs. When you find an event, look for the basics: the start and end times, the venue address, whether vendor or tailgate space is separate from indoor tables, the admission price, whether there is a talk-in frequency, and whether a VE exam session is offered and if it needs pre-registration. Many events list talk-in on a local 2 m repeater, but verify the repeater's offset and any CTCSS tone before you rely on it. A few things are worth having in the car for a swap meet. A multimeter, a small notebook, a tape measure, some cash in small bills, a tote or folding cart, and a few zip bags for connectors and small parts. If you're after a specific rig, take the model number, a rough idea of what it should cost used, and a list of things to check, such as the mic connector, the display, the power connector and the accessories that should come with it. If a seller has a bench supply and a dummy load, ask whether you can see the radio power up and key into the load. Not everyone can accommodate that, but it's a fair question. The other side of hamfests is the club scene. Clubs run nets, Field Day, public service support, license classes, VE sessions, foxhunts, build nights and Saturday breakfasts. A club that looks quiet on paper can be lively in person, and the reverse also happens. So how do you pick which events and clubs are worth your time? And what do you look for when you're new to a group or visiting one for the first time?
-
Just got your callsign? Introduce yourself and share your first QSO (or your plan for it)
If HF is your target, expect the first contact to feel different from a repeater chat. Conditions, antenna and power all matter, and it can take a few tries to get a clean exchange. Picking an active, structured event can help. Parks on the Air (POTA) and Summits on the Air (SOTA) activators call CQ and work stations quickly, so you can just give your callsign when asked and get a quick report. These are usually short, scripted exchanges, which makes them a good fit if you're nervous. Don't be discouraged if the first few calls get no answer. Try a different band or time of day, and double check that you're transmitting on the right sideband or mode for the frequency. On voice, upper sideband is the convention above roughly 10 MHz and lower sideband below, though check the band plan for where you're allowed to operate. Also think about whether you want to start with FT8 or another digital mode. It lets you make contacts at low power with a modest antenna, though you do need to set up the software and keep your computer clock accurate. Plenty of people like to try voice first and then add digital later, or the other way around, so there's no wrong route.
-
Cleaner CW sending and easier copy: keyer mode, paddle setup, spacing, and head-copy habits
One setting worth checking is weight and any "auto-spacing" option. A keyer weighted heavy or light can make your code sound strange even if the speed is right. A ratio close to the standard dash-to-dot proportion is a safe starting point, and most people should only change it for a specific reason, not to "personalize" their fist. Auto-spacing, where the keyer forces correct gaps between characters, is helpful for some operators and awkward for others. If you often run characters together, it can enforce a pause. If you find it makes your sending feel delayed, turn it off and practice deliberately pausing between letters. Either way, check by recording yourself. For receive practice, send-and-copy drills with a partner or recorded text can work well, but be careful with software decoders. They can be useful for checking a missed word, but they tend to struggle with fading, noise, and irregular hand-sent timing. If you lean on one too much, you may never train yourself to copy in the conditions you actually find on the band.
-
Getting cleaner SSB audio: mic gain, ALC, compression and bandwidth. What actually matters?
On the "most overrated" question, my vote goes to wide transmit bandwidth combined with a lot of treble boost. It can sound great on a local rag chew, but on a crowded band the extra bandwidth is mostly just interference for the neighbors, and the high-frequency boost does little for copy under noise. For DX and contest conditions, a fairly tight, clean signal with the lows trimmed usually gets more readable contacts than a "broadcast" sound. One way to check without guessing: record your own transmission on a separate receiver or SDR, then look at it on a waterfall as well as listening. If the signal is clean, you'll see a neat block of energy. If you see spikes or wide skirts when you speak loudly, you're probably overdriving something, whether that's the mic gain, the processor or the amplifier. A two-tone test into a dummy load, ideally with a scope or a spectrum monitor, is the more rigorous way to check linearity, and it doesn't put a test signal on the air.
-
Designing a communications exercise where the repeater fails in the first hour: what should we test?
One inject I'd add is a conflicting report. For example, two stations describe the same road differently, one saying it's blocked and the other saying it's passable. It forces net control to ask for clarification, identify the source, and decide how to log it, rather than just relaying whatever arrives. It also tests whether the served agency can tell the difference between confirmed and unconfirmed information. I'd also keep the first run low-stakes. If the aim is learning, run a short comms check on the fallback channels before the scenario starts. That way a wrong frequency or a missing programmed channel gets fixed as a setup issue, not mistaken for a procedural failure. Then use the after-action discussion to sort problems into training, equipment, and plan, because the fixes are very different.
-
Technician to General: how should I study for Element 3, and what changes on HF once I pass?
On the first question: yes. A licensed Technician already has credit for Element 2, so the upgrade to General is Element 3 only. As I understand the usual format, it has 35 multiple-choice questions drawn from the published NCVEC question pool, and 26 correct answers pass. Check the current pool and the session rules with your VE team, because the pool is revised on a multi-year cycle and you want to study the one that is in effect when you test. Memorizing alone works for some people, but it is a weak plan for Element 3. The pool has many questions about the same concept worded differently, and understanding the concept lets you answer all of them. A practical study order: Start with operating procedures and Part 97 rules. These are the most familiar areas for a Technician. Cover control operator privileges, station identification, third-party traffic and the rules around the 60 meter channels. Then take on propagation. Learn how the ionospheric layers behave: the D layer absorbs lower HF frequencies during the day, higher bands need a high enough MUF to be open, and the gray line can help on the low bands. Once you understand why 40 and 80 meters are better at night and 15 and 10 meters depend on solar conditions, many questions become easy. Next, antennas and feed lines. Know the basic dipole, a quarter-wave vertical, what SWR does and does not tell you, and how coax loss changes with frequency. After that, the electronics sections: Ohm's law, reactance, filters, and basic receiver and transmitter block diagrams. Use a practice-exam site or app that explains wrong answers, and retake only the topics where you miss questions. When you consistently score well above the pass line on randomized practice exams, you are probably ready.
-
Studying for the Technician exam: how do you use the question pool without just memorizing letters?
Use the practice exams as a diagnostic, not as the main study method. Read a chapter or watch a lesson on one subelement, then do only the questions for that topic. When you miss one, read the explanation and write the concept in your own words. "Answer C" doesn't help, because the real exam can scramble the order of the choices. "A 2 meter repeater with a standard offset transmits and receives on different frequencies" is something you can reuse. Also check which pool is in effect before you buy a book or app. The NCVEC publishes the Technician pool and it is revised on a regular cycle, so an old guide can include questions that are gone and miss new ones. Confirm the effective dates on the NCVEC site or the publisher's page. For the "do I really know this" test, cover the answer choices and try to answer the question out loud. If you can't, you only recognize the wording. Another check is to explain it to someone who has never touched a radio. Do that for things like why a higher antenna usually extends VHF/UHF range, or why you need to know your transmitter's frequency before you key up.
-
Cleaning up your CW: iambic settings, paddle adjustment, and copying without counting dits
A lot of CW advice gets lumped into "just get on the air and practice," but sending and receiving usually stall for specific, fixable reasons. This thread is for comparing notes on the mechanical side (keyer mode, paddle setup, spacing) and the head side (copying by sound, handling QSB and QRM). Sending. Most sloppy sending is a timing problem, not a speed problem. In standard Morse timing a dit is one unit, a dah is three, the gap inside a character is one, the gap between characters is three, and the gap between words is seven. At the PARIS standard, one dit lasts 1200 divided by your WPM in milliseconds, so about 60 ms at 20 WPM. If your letters run together or your words smear into each other, the character and word gaps are usually too short. Pause a little longer than feels natural, and the copy gets easier for the other station. Iambic mode. If you use iambic paddles, check whether your keyer is in Mode A or Mode B. In Mode B, if you release the paddles during a squeeze, the keyer adds one more opposite element. In Mode A it stops when you let go. Neither is better. Mode B can save motion on letters like C, K, and Q, but it often produces an extra dit or dah until you adapt to it. If you keep sending a stray element at the end of a character, switch modes before you blame your hands. Paddles. Contact gap and spring tension matter more than most people expect. A gap that is too wide makes you move farther than you need to and invites fatigue. A gap that is too narrow or too light invites double-hits and accidental squeezes. Adjust one thing at a time and keep the paddles on a stable base. If they slide around, you will fight them without realizing it. Also check that your wrist is supported and your fingers aren't doing all the work. Receiving. Counting dits and dahs puts a ceiling on your speed. Learn each character as a sound pattern, not a written pattern. Many people use the Koch method, starting at a usable speed (often 15 WPM or higher for the characters themselves) with only a couple of letters and adding new ones as copy gets solid. Farnsworth spacing is another option: characters are sent at full speed, with extra time between them, so you don't learn them at a crawl. Whichever you pick, don't write down every dit as it goes by. Let the character finish, then write it. On the air. A narrow receive filter helps with QRM but can ring badly if it is too tight, which makes weak signals harder to copy. Set the sidetone and receive pitch to something comfortable, since a pitch you dislike will wear you out over a long session. Before calling CQ on a frequency, send QRL? and listen. And if you miss something, ask for just the part you missed (for example, AGN or a repeat of the call sign or the report) instead of requesting the whole exchange again. What are you working on right now: keyer settings, paddle feel, copy speed, or contest-style exchanges? Which fixes made the biggest difference?
-
Tabletop scenario: repeater down, cell service congested, 12 shelters to track. What would you inject?
One inject worth adding is a gradual degradation instead of a clean failure. A dead repeater is easy to recognize. A repeater that's still keying up but with a weak or noisy signal creates more confusion, because people keep trying it and wasting airtime. Exercise control can tell certain stations they're now unreadable, or give them only partial copy. That forces net control to make the call to change channels rather than waiting for an obvious failure. I'd also watch the written message flow as closely as the voice traffic. A common bottleneck is that a shelter sends a status report on voice, net control writes it on a scrap of paper, and then someone retypes it for the EOC. Each handoff is a chance for errors. If your group uses a standard message form such as the ICS-213, track how many messages arrive complete: originator, recipient, date and time, message body, and a clear precedence. A simple count of how many needed a second request is more useful than a general impression of how the net went. For evaluation, separate the questions. One is whether the technical path worked. Another is whether the procedure was followed. A third is whether the information was useful to the person receiving it. A net can run smoothly on the air and still deliver status reports the EOC can't act on.
-
SSB audio checklist: mic gain, ALC, compression and bandwidth without splatter
I'd add one caution about relying on the ALC meter, because the scale and behavior differ between rigs. On some radios the ALC needs to stay inside a marked zone, and on others it should barely move at all. The manual is a better guide than a general rule of thumb. What stays constant is the effect: once the ALC is clamping down hard, you lose dynamics and the signal gets wider than it should be. For processors, I'd test in small steps and record each one. A recording made with the monitor on can mislead you, because the monitor taps a point inside the radio. Ideally record the signal off the air on a separate receiver, or at least compare it with a report from a station that is not close by. Close-in local stations may hear a very strong signal that hides distortion. A distant station with some noise on the band tells you more about whether the processing is actually helping. With an amplifier, I'd treat drive as a separate adjustment from mic gain. Set the mic and processor first for clean exciter audio, then adjust the drive control or exciter power so the amp reaches its output without strain. Getting these two mixed up is a common reason for splatter.
-
Cutting a first dipole or vertical from scratch: what to calculate, what to measure, and what to just trim
For verticals, the ground system is the part that gets underestimated. A quarter-wave vertical needs something to push against, and a ground-mounted one with only a few short radials loses a lot of power in the soil. A common pattern is many radials on or just below the ground, with 16 or more as a decent target if you are going that way. If you can get the base up off the ground, a handful of elevated resonant radials, even just three or four, often works well. Sloping them down at around 45 degrees tends to raise the feedpoint impedance toward 50 ohms, while a quarter-wave vertical with flat radials sits nearer 36 ohms. If you want to try a wire vertical, a lightweight fiberglass pole, a quarter-wave wire taped to it and a few radials are a very cheap experiment. Put a choke at the feedpoint as well, because the coax shield can easily become part of the radiating system and spoil both the pattern and the measurements. If the SWR changes when you touch or move the coax, that is a good hint that common-mode current is at work.
☀
Solar
SFI
90
SN
33
A
3
K
1
Quiet
X-Ray
B1.3
Wind
312.6 km/s
Aurora
2
Updated 11:00 UTC
HamQSL · N0NBH
Day
80/40m Fair 30/20m Good 17/15m Fair 12/10m Poor
Night
80/40m Good 30/20m Good 17/15m Fair 12/10m Poor
Callsign Lookup
_
Vanity Call Signs Available
Enter filters above and click Search.
ⓘ Callsign lookups are in real time via the FCC database.
Vanity callsign availability is refreshed daily at 6:00 AM CST.
The vanity search may be unavailable for a few minutes during this update.
Susan Clark
Members
-
Joined
-
Last visited